SH-20 - Bridge and Approaches
Infrastructure, Renovation
Conception
$2,751,704 CJ est. value
Hominy, OK 74035

Bridge and Approaches - SH 48
Infrastructure
Conception
$1,509,650 CJ est. value
Tupelo, OK 74572

Demolition of Old Police Station
Demolition, Infrastructure
Design
$12,000 CJ est. value
Lawton, OK 73501

Resurface - US 62
Infrastructure
Design
$6,700,000 CJ est. value
Cache, OK 73527

Eufaula Lake Stilling Basin Repairs
Infrastructure
Bidding
$5,000,000 CJ est. value
Stigler, OK 74462

Perimeter Road Rehabilitation - Phase 1
Infrastructure
Bidding
$6,000,000 CJ est. value
Tulsa, OK 74115

University of Oklahoma Softball Stadium
Demolition, New Construction, Infrastructure
Sub-Bidding
$42,000,000 CJ est. value
Norman, OK 73069

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Wyandotte Nation - Turtle Hill Estates Phase I
Infrastructure, Alteration
Results
Wyandotte, OK

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

Crest Fresh Market - Covell and Sooner / Edmond
New Construction, Infrastructure - 101,422 SF
Construction
$27,000,000 CJ est. value
Edmond, OK 73034

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

Last Updated 10/26/2022 03:32 PM
Project Title

Villas on the Greens Lift Station Conversion

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74014   (Wagoner County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $674,845 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Villas on the Greens Lift Station Conversion Project includes removal of the existing Villas On The Greens Lift station and any bypass pumping necessary during this time. Project also includes construction of approximately 780 linear feet of 8" PVC gravity main on the west side of Midway Road from an existing manhole just north of E. Greely Pl. going southerly to the Villas On The Greens lift station north of E. Freeport St. in Broken Arrow, OK. Work includes common trenching, placement of new manholes and connections to existing ones, removal and replacement of concrete pads, erosion controls (silt fence and fiber log), and other utility construction activities. Construction time will be 90 calendar days. "Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended." B. "Each bidder must fully comply with the requirements, terms and conditions of the Environmental Protection Agency's Disadvantaged Business Enterprise Requirements including employing the six (6) good faith efforts and soliciting disadvantaged business enterprises during the performance of this contract. The bidder commits itself to following the good faith efforts to solicit disadvantaged business enterprises contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in OWRB's Guidance and Procedures, ORF-267." C. "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub-contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code and 29 CFR parts 1,3, and 5. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to BAMA. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by BAMA in the amounts equal to the Contract price. BAMA reserves the right to reject any or all Bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans