Similar Projects
Link Road/Boonsboro Road Intersection Improvements - City of Lynchburg
Infrastructure
Conception
$2,015,896 est. value
Lynchburg, VA 24503

Providence Church Addition
Addition, Infrastructure
Conception
$2,000,000 CJ est. value
Lynchburg, VA 24502

Runway 4-22 Rehabilitation and Lighting Upgrade - City of Lynchburg
Infrastructure
Design
$10,800,000 CJ est. value
Lynchburg, VA 24502

Runway 4-22 Rehabilitation and Lighting Upgrade - City of Lynchburg
Infrastructure
Design
$10,800,000 CJ est. value
Lynchburg, VA 24502

RFP Design - Bedford Avenue Bridge Replacement
New Construction, Infrastructure
Bidding
$721,000 CJ est. value
Lynchburg, VA 24504

RFP Design - Bedford Avenue Bridge Replacement
New Construction, Infrastructure
Bidding
$721,000 CJ est. value
Lynchburg, VA 24504

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

West Edge Apartments Formerly Midtown Mixed-Use
New Construction, Infrastructure
Construction
$115,000,000 CJ est. value
Lynchburg, VA 24502

West Edge Apartments Formerly Midtown Mixed-Use
New Construction, Infrastructure
Construction
$115,000,000 CJ est. value
Lynchburg, VA 24502

Wyndsor View Townhomes / Lynchburg
New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Lynchburg, VA 24504

Clover Place Self Storage
New Construction, Infrastructure - 3,200 SF
Pending Verification
$850,000 CJ est. value
Lynchburg, VA 24501

College Lake Dam Removal - ME018 - City of Lynchburg
Demolition, Infrastructure
Conception
$20,000,000 CJ est. value
Lynchburg, VA 24501

Last Updated 07/07/2023 05:33 PM
Project Title

General Aviation Apron Expansion Rebid

Physical Address View project details and contacts
City, State (County) Lynchburg, VA 24502   (Lynchburg City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work included under this Contract shall consist of all labor, materials, equipment, and the performance of all work necessary to complete the project known as General Aviation Apron Expansion as described in the Contract Documents. This Work shall be performed in accordance with the Contract Documents. 1. General: Subject to Owner's right to waive informalities, to be valid for consideration, bids must be completed and submitted in accordance with these instructions to bidders. All individual bid unit price items must be filled in, regardless of the quantity shown. All requests for clarification of or questions regarding this Advertisement for Bids or for additional information must be made in writing, by email to Melissa Tillman, CPPB at: melissa.tillman@lynchburgva.gov and received by 1:00 p.m., May 22, 2023. Any and all addenda will only be posted to the City's website at: http://www.lynchburgva.gov/current solicitations . This project is located at the Lynchburg Regional Airport, 350 Terminal Drive, Lynchburg, VA 24502. The Scope of Work includes construction of a concrete apron pavement to connect an existing general aviation apron to support a proposed Freedom Aviation Hangar building (building by others). Work elements include excavation, geotextile fabric, crushed aggregate base, cement-treated aggregate base, and cement-concrete paving (2,500 SY w/ 13.5" thickness). Additional work elements will include joint sealing, turf establishment, and the relocation of an existing area light and associated circuitry. Bid Alternate #1 will include expanded work elements related to the adjacent overhead area lights, including (3) new LED lights and light poles. Note: There is an 8% DBE goal requirement set by the Federal Aviation Administration (FAA) for AIP projects. The FAA Contract Provisions include Davis-Bacon Requirements that will be mandatory; wage rates valid at the time of bidding shall be effective throughout the contract term. Lynchburg Regional Airport, Lynchburg, VA Any and all addenda will ONLY be posted to the Citys website.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents