Similar Projects
Last Updated | 07/07/2023 05:33 PM |
Project Title | General Aviation Apron Expansion Rebid |
Physical Address | View project details and contacts |
City, State (County) | Lynchburg, VA 24502 (Lynchburg City County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work included under this Contract shall consist of all labor, materials, equipment, and the performance of all work necessary to complete the project known as General Aviation Apron Expansion as described in the Contract Documents. This Work shall be performed in accordance with the Contract Documents. 1. General: Subject to Owner's right to waive informalities, to be valid for consideration, bids must be completed and submitted in accordance with these instructions to bidders. All individual bid unit price items must be filled in, regardless of the quantity shown. All requests for clarification of or questions regarding this Advertisement for Bids or for additional information must be made in writing, by email to Melissa Tillman, CPPB at: melissa.tillman@lynchburgva.gov and received by 1:00 p.m., May 22, 2023. Any and all addenda will only be posted to the City's website at: http://www.lynchburgva.gov/current solicitations . This project is located at the Lynchburg Regional Airport, 350 Terminal Drive, Lynchburg, VA 24502. The Scope of Work includes construction of a concrete apron pavement to connect an existing general aviation apron to support a proposed Freedom Aviation Hangar building (building by others). Work elements include excavation, geotextile fabric, crushed aggregate base, cement-treated aggregate base, and cement-concrete paving (2,500 SY w/ 13.5" thickness). Additional work elements will include joint sealing, turf establishment, and the relocation of an existing area light and associated circuitry. Bid Alternate #1 will include expanded work elements related to the adjacent overhead area lights, including (3) new LED lights and light poles. Note: There is an 8% DBE goal requirement set by the Federal Aviation Administration (FAA) for AIP projects. The FAA Contract Provisions include Davis-Bacon Requirements that will be mandatory; wage rates valid at the time of bidding shall be effective throughout the contract term. Lynchburg Regional Airport, Lynchburg, VA Any and all addenda will ONLY be posted to the Citys website. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |