Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Catch Basin Cleanout
Post-Bid
Reed City, MI 49677

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

Bedford SRF Manholes and Sewer Improvements
Results
Less than $1,750,000 est. value
Monroe, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Sanitary Sewer Rehabilitation Project
Construction
Less than $200,000 est. value
South Rockwood, MI

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Sanitary Sewer Repairs
Results
Less than $60,000 est. value
Wyandotte, MI

Two (2) Years – Hydrant, Grate and Manhole Cover Parts
Term Contract
Post-Bid
Flint, MI

Catch Basin Clean Out
Results
Hillsdale, MI

Trough Drain Maintenance
Post-Bid
Sandusky, MI

Royal Oak Township Sanitary Sewer Rehabilitation
Results
Less than $378,574 est. value
Royal Oak, MI

Big Creek Drain Maintenance
Post-Bid
Sandusky, MI

2019-2022 Sewer Cleaning and Video Inspection Service
Results
Port Huron, MI

Cargill and BRS Drain Maintenance
Post-Bid
Sandusky, MI

Last Updated 01/22/2020 08:33 AM
Project Title

Cowan Lake Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Rockford, MI 49341   (Kent County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes approximately 7,000’ of 1 ½”, 9,000’ of 3”, 200’ of 4” and 20,000’ feet of 6” HDPE forcemain installed by directional drilling, the new Cowan Lake submersible duplex pump station including its natural gas generator, installation of 65 simplex grinder stations, improvements to existing pump station #1 including recoating the wetwell interior, the addition of a natural gas generator and air scrubber and their associated electrical improvements. Improvements to the wastewater treatment plant including approximately 5 acres of tree clearing, expansion of the treated water irrigation system and irrigation system control modifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents