Similar Projects
DET Circuit Breaker Testing and Cleaning
Bidding
Madison, WI

Lakeview Library Lighting Upgrade
Bidding
$80,000 est. value
Madison, WI 53704

South Fork Substation MV Circuit Breakers
Post-Bid
River Falls, WI

Install Outlets Bldg 2187 in Hallway Between Rooms. 123 & 128 and in Rooms 121, 127, 129, 132, 133 (Wo 1956)
Post-Bid
Less than $25,000 est. value
WI 54656

Redundant UPS System Installation
Results
Less than $120,000 est. value
Whitewater, WI 53190

Switchgear Breaker Upgrades
Results
Less than $230,000 est. value
Madison, WI 53704

Electrical Distribution System Testing & Inspection
Term Contract
Bidding
Milwaukee, WI 53295

Uninterrupted Power Supply (UPS) and Batteries
Post-Bid
Sparta, WI 54656

2020 Public Works Garage Lighting Upgrades
Results
Less than $25,000 est. value
Monona, WI 53716

Arts Sculpture Laboratory - MEP
Bidding
$2,020,000 est. value
Whitewater, WI 53190

Replace Electrical-Building 19 607-19-107
Post-Bid
$2,000,000 to $5,000,000 est. value
Madison, WI

LED Lighting Upgrades
Results
New London, WI 54961

Electrical Services
Term Contract
Bidding
Green Bay, WI

Electrical Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Last Updated 01/19/2021 05:57 AM
Project Title

Naga-Waukee Irrigation Panel Replacement

Physical Address View project details and contacts
City, State (County) Pewaukee, WI 53072   (Waukesha County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The successful vendor (hereinafter contractor) shall replace the existing control panel with a new control cabinet from Watertronics, Inc. that comes with Variable Frequency Drive (VFD) technology. The control panel will include the PLC, with a color touch screen operator interface device and software programming written specifically for this project. The new panel’s PLC will include the logic to operate the new Electronic Butterfly Valves (EBV’s), in case of VFD fault or failure. The panel will include Variable Frequency Drives (VFD’s), and all high voltage switch gear. All new motor leads to the motors will be included. All existing external sensors such as a flow sensor or pressure transducer, are required to be replaced. The panel will replace our existing pump control panel located on the pump station skid. The station is installed inside an existing weather resistant building. The existing motors, pumps, manifold, skid, and piping will all be re-used.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents