Similar Projects
Medium Voltage Utility Line Construction
Infrastructure
Design
$180,000 CJ est. value
Rainsville, AL 35986

Dekalb County Jail Addition
Addition, Demolition, Infrastructure
Bidding
$3,500,000 CJ est. value
Fort Payne, AL 35968

Installation of PVC Gravity Sewer
Renovation, Infrastructure
Bidding
$1,630,000 CJ est. value
Fort Payne, AL 35967

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Resurfacing and Traffic Stripe
Infrastructure
Post-Bid
$225,000 to $250,000 est. value
Rainsville, AL

Geraldine Annual Paving 2021
Infrastructure
Results
$215,000 to $230,000 est. value
Geraldine, AL

Constructing The Resurfacing (Scrub Seal), Guardrail Replacement, And Traffic Stripe On Sr-227 From The Intersection Of Sr-75 In Geraldine To The Junction Of Cr-400
Infrastructure
Results
$1,104,572 to $1,350,032 est. value
AL

Big Wills Creek Sewer from Airport Road Pump Station to Wzob Pump Station
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Payne, AL 35967

Resurface and Traffic Stripe Rosewood Lane, Willingham Street, Davis Avenue, Martin Lane and Gala Street
Infrastructure
Post-Bid
$200,000 est. value
Rainsville, AL 35986

Constructing the Reconstruction (Grading, Drainage, Pavement, and Pavement Removal) on I-59 (Northbound Roadway and the Southbound Outside Shoulder) From 0.390 Mile South of the CR-276
Infrastructure
Results
$32,775,224 to $40,058,607 est. value
Collinsville, AL

Reconstruction (Pavement Removal, Grading, Drainage, Pavement, and Traffic Stripe) on I-59 (Northbound Roadway)
Infrastructure
Bidding
$47,339,791 CJ est. value
Fort Payne, AL 35968

Resurfacing of Carmichael Road
Infrastructure
Post-Bid
$260,000 est. value
Hammondville, AL

Brooks Street Improvement Project
Infrastructure
Results
Fyffe, AL 35971

New Ider Softball Field and Concession Stand
New Construction, Infrastructure
Bidding
$900,000 CJ est. value
Ider, AL 35981

RFQ Contractor - Expansion of the Water Distribution System
Infrastructure
Post-Bid
$950,000 CJ est. value
Fort Payne, AL 35967

Last Updated 11/28/2022 07:34 AM
Project Title

Micro-Milling, Resurfacing, and Traffic Stripe on I-59 (Southbound Roadway)

Physical Address View project details and contacts
City, State (County) Hammondville, AL 35989   (De Kalb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,520,498 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Dekalb Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-59 (Southbound Roadway) from south of the SR-35 Underpass (MP 217.850) to north of the SR-7 (US-11) Overpass (MP 225.600) to include the I-59 Southbound Roadway outside shoulder (MP 225.600 to MP 233.350) northeast of Hammondville. Length 15.499 mi. The Bracket Estimate on this project is from $3,914,271 to $4,784,109 . Contract Time: 75 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 021 - Micro-Milling, Resurfacing, and Traffic Stripe on I-59 (Southbound Roadway) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents