Similar Projects
Chattahoochee River Intake Pump Station
New Construction
Bidding
Atlanta, GA

Southbridge Golf Course Storm Pipe Replacement
Infrastructure
Bidding
GA

Construct and Repair Outfall 9 Culvert at Poorhouse Creek and Windy Hill Road
Post-Bid
Marietta, GA 30069

Sewer System Evaluation Surveys
Post-Bid
Lake City, GA 30260

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Pump Station 4021 Rehabilitation and Upgrade
Results
Brunswick, GA 31520

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

North Fork Storage and Pump Station
New Construction, Infrastructure
Bidding
Atlanta, GA

On-Call Stormwater Infrastructure Response Installation and Repair Services
Term Contract
Post-Bid
Chamblee, GA 30341

2016 Splost North Mainland Phase II Pump Station Improvements
Results
Brunswick, GA 31520

Downey Street Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Horseleg Creek Sanitary Sewer Pump Station Addition
Results
Rome, GA 30161

Born Street Storm Drain Connect to Existing System Project
Post-Bid
Lawrenceville, GA 30046

Church Street Stormwater Improvements CDBG
Results
Less than $204,555 est. value
Buford, GA 30518

Stormwater Maintenance Plan
Post-Bid
Savannah, GA 31404

Last Updated 12/03/2021 08:59 AM
Project Title

Spot Road Pump Station And Gravity Sewer

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,075,140
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the following Work: Division One — Spot Road Pump Station: The Project will involve furnishing all materials, labor, and equipment to install one 50 HP Duplex Submersible Pump Station and any appurtenances as necessary for completion of the work described within the plans and specifications. Division Two — Spot Road Gravity Sewer and Force Main: The Project will involve furnishing all materials, labor, and equipment to install approximately 2,800 LF of 10-inch gravity sewer and 80 LF of Cased Jack & Bores and any appurtenances as necessary for completion of the work described within the plans and specifications.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 41 - Material Processing and Handling Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents