Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Placement Area 24 Levee Construction Project
Post-Bid
Port Arthur, TX 77642

Construction of the Pile Cap Project
Post-Bid
Sabine Pass, TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Sabine Pass Area Drainage System Select Ditch Cleanout
Results
Sabine Pass, TX 77655

Placement Area 12 Levee Construction Project
Post-Bid
Port Arthur, TX

Beaumont Municipal Airport Ditch Cleaning and Repair Project
Results
Less than $97,000 est. value
Beaumont, TX

Construction of the Exxon Mobile Intake Structure
Infrastructure
Post-Bid
Beaumont, TX

Tyrrell Park Loop Drainage
Results
Beaumont, TX

Memorial High School Drainage Improvement Project
Infrastructure
Post-Bid
$39,300 est. value
Port Arthur, TX 77642

Mcfaddin National Wildlife Refuge Beach Restoration Phase 2
Results
$55,400,000 to $66,800,000 est. value
Sabine Pass, TX 77655

Tyrrell Check Levee Improvements
Results
$600,000 est. value
Beaumont, TX

Dune Planting for the Mcfaddin National Wildlife Refuge Beach and Dune Restoration Project
Results
$610,000 est. value

Box Culverts at Lawhon Road and Ground Bridge Gully Crossing
Results
TX 77713

2021 Hitt Avenue Drainage and Sanitary Sewer Improvement
Infrastructure
Results
Groves, TX

Reported 03/09/2022 12:00 AM
Project Title

Stephen F. Austin Newcomers Center Project

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77640   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Stephen F. Austin Newcomers Center Project includes Improving the drainage in five (5) separate green space areas in the front of the school between the building and the parking lot. The L/M/WBE goal is 25%

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents