Similar Projects
Gressette Building Combined Mechanical Projects
Bidding
$675,000 to $775,000 est. value
Columbia, SC

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Sumter Street HVAC Replacement
Post-Bid
$500,000 to $550,000 est. value
Columbia, SC

Geology Building - Repair - Replace Roof Top HVAC Unit
Results
$139,000 est. value
Columbia, SC

Y--544-17-121 Replace AHU-23 Construction
Results
$100,000 to $250,000 est. value
Columbia, SC 29209

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

HVAC Units and Parts
Results
$19,113 est. value
Columbia, SC

Matthew J. Perry CT IT & AV Rooms HVAC
Post-Bid
$500,000 to $1,000,000 est. value
Columbia, SC 29201

Furnish and Deliver HVAC Filters for USC Housing
Results
Columbia, SC

Marion Gressette Building - Hot Water Pump/Heat Exchanger
Post-Bid
$258,000 to $270,000 est. value
Columbia, SC

Water Treatment Services DMH Facilities
Term Contract
Results
Columbia, SC

J--Replacement of Nine (9) Fan Coil Units & New DDC Control
Post-Bid
Columbia, SC 29209

41--Cooling System
Results
Columbia, SC 29209

FM Energy Facility - Replace Chiller #4, Cooling Towers #2 and #4 and Electrical Systems
Post-Bid
$2,000,000 to $2,250,000 est. value
Columbia, SC 29201

Annual Chiller Maintenance Service
Term Contract
Results
Columbia, SC 29223

Reported 06/04/2019 12:00 AM
Project Title

Replace HVAC and Boilers

Physical Address View project details and contacts
City, State (County) Eastover, SC 29044   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The South Carolina Air National Guard anticipates the solicitation and award of a contract to replace HVAC, Boiler, DDC, and Smart Metering Systems Base-Wide. The project scope includes but is not limited to the installation of high efficiency chillers, split systems, and package systems with high efficiency air conditioning and chiller systems. The replacement of boilers with high efficiency boilers. The upgrade of existing DDC system to current DoD standards. The installation of electric, natural gas, and water smart meters.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents