Similar Projects
Unit Well 26
Infrastructure
Bidding
Madison, WI

Well 18 Treatment
Post-Bid
Less than $160,000 est. value
Madison, WI 53713

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

Sun Prairie Utilities Test Well for Well 10
Results
Sun Prairie, WI

2022 SCB2 Hot Water Pump Purchases
Infrastructure
Post-Bid
$50,000 est. value
Madison, WI

2020 Grinder, Pump Station 17
Results
Madison, WI

Booster Pump for Unit Well 12
Infrastructure
Post-Bid
Madison, WI 53711

2021 Grinder, Pump Stations 17
Results
Madison, WI

Landfill Gas Extraction Well Drilling and Construction
Results
Madison, WI 53718

Pumping Stations No. 6 and No. 10 Variable Frequency Drive Upgrades
Renovation
Results
$200,000 est. value
Madison, WI 53714

Water System Improvements – Well No. 3 Wellhouse
Infrastructure
Results
Windsor, WI

Lexington Booster Station Modifications
Renovation
Results
Waunakee, WI 53597

Last Updated 03/22/2022 02:25 PM
Project Title

2022 Water System Improvements - Contract B

Physical Address View project details and contacts
City, State (County) Cross Plains, WI   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new municipal water supply well house to include: masonry building, well pump and associated mechanical piping, chemical feed equipment, electrical and instrumentation equipment, natural gas standby generator, site working including paving, extension of water main and sanitary sewer, and SCADA and controls work at two lift stations, two reservoirs, three wells, the WWTP, and the Public Facilities Office.

Details

Lift and Pump Stations, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents