Similar Projects
Last Updated | 06/07/2023 05:14 PM |
Project Title | Asheville Regional Airport South Parking Area |
Physical Address | View project details and contacts |
City, State (County) | Fletcher, NC 28732 (Henderson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $650,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is located at the Asheville Regional Airport in Fletcher, North Carolina. It generally consists of the following scope items: clearing and grubbing, earthwork and grading, construction of a new parking lot with approximately 650 spaces, including paving, markings, and signage, installation of stormwater drainage pipes and structures, construction of two parking lot entrance roads, one stream crossing, various erosion and sediment control measures, including two temporary skimmer basins, one of which will be converted to a permanent stormwater basin, and site stabilization/landscaping. A secondary work area to the south of the proposed parking lot includes earthwork and grading, removal of vegetation within stream limits, installation of stormwater drainage pipes and structures, and site stabilization/landscaping. Questions about this project should be directed to: J. Denise Merritt Avcon, INC. 10115 Kincey Avenue, Suite 140, Huntersville, NC 28078 Phone:704-954-9008 Email:dmerritt@avconinc.com Existing plan holders will be notified by email upon the release of any addenda. Failure to order bid sets through Duncan-Parnell may prevent you from being notified of issued addenda. Printed copies of addendum will be available at no additional charge. Contractors must be listed on NCDOT Prequalified list as a bidder or Prime to bid on this contract. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to July 2023. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |