Similar Projects
RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Grading, PCC Surfacing, Curb and Gutter, Sidewalk, Lighting
Infrastructure
Conception
$9,539,000 CJ est. value
Egan, SD 57024

Signing and Delineation - Gravel Roads
Infrastructure
Design
$1,100,000 CJ est. value
Deadwood, SD 57732

Full Depth Reclamation, AC Surfacing, Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$8,494,000 CJ est. value
East Central Pennington, SD 57725

Asphalt Concrete Resurfacing of Shoulders, Edge Drains, Repair STR Bridge, Joint & Spall Repair, Pipe Work, Lighting
Infrastructure
Bidding
$3,499,000 CJ est. value
Pukwana, SD 57370

Replace Str Bridge, Approach Grading
Demolition, New Construction, Infrastructure
Bidding
$2,897,000 CJ est. value
Keystone, SD 57751

High School CTE and Lab Facility
New Construction, Infrastructure - 18,300 SF
Sub-Bidding
$5,800,000 CJ est. value
Hot Springs, SD 57747

Phase 2 Grading Project - Central Park
Infrastructure
Post-Bid
$350,000 est. value
Harrisburg, SD

25-Bed Adult Detention Center Design-Build and Construction Administration Services
New Construction - 12,800 SF
Post-Bid
Agency Village, SD

Outdoor Pool Earthwork
Infrastructure
Results
$1,114,745 est. value
Pierre, SD

Harrisburg Schools 4th Addition Mass Grading
Infrastructure
Results
Sioux Falls, SD 57109

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

Deck Replacement, Approach Slabs, Rehab Abutments, Bridge Painting
Infrastructure
Conception
$1,846,000 CJ est. value
Sioux Falls, SD 57107

North 80 Subdivision - Lot 8 & 9
New Construction, Infrastructure - 910,404 SF
Design
$49,000,000 CJ est. value
Rapid City, SD 57701

Last Updated 10/13/2022 02:35 PM
Project Title

Groundwater Storage Tank- City of Mitchell

Physical Address View project details and contacts
City, State (County) Prosper Township, SD 57301   (Davison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Ground Storage Tank Improvement project proposes to install a 2.5 million ground storage tank. The tank is proposed to be 110 feet in diameter and have 35 foot sidewalls. Ten (10) acres of land has been purchased and is located northeast of the Highway 37 and 256th Street intersection for placement of the tank. A pump station and chemical feed facility will also be placed on the site. The design will also include incorporating a separate pressure zone for the southern portion of the city to address low pressure, additional piping at the current water treatment facility to allow for a bypass and demolition of the Burr Street elevated storage tank. As of March 25, 2022, design is 90% complete. The project is anticipated to bid in Fall 2022. Construction will begin in 2022 and be completed in 2024.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents