Similar Projects
Last Updated | 08/10/2022 08:44 AM |
Project Title | Small Diameter Water Main Rehabilitation 24 - KK - District of Columbia Water and Sewer Authority |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20036 (District of Columbia County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2025 |
Bids Due | View project details and contacts |
Estimated Value | $69,177,500 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The annual project is for the rehabilitation of small diameter (12-inch and smaller) water pipe. The objective is to replace pipe when the condition warrants, or to clean and line unlined cast iron pipe is in sound condition. Work includes the elimination of dead end pipelines in the system, and the replacement of appurtenances, such as valves, fire hydrants, and house service lines. To minimize public inconvenience caused by construction work and to savce DC Water the paving cost, this project also includes water infrastructure jobs that are coordinated with street rehabilitation or other construction work performed by the District Department of Transportation (DDOT). The program serves to gradually replace deteriorated pipe, and improve available fire flows and water quality. This project is in included in the City's or County's FY 2022-2031 Capital Improvement Plan (CIP). As of August 10, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |