Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Mixed Use Project
New Construction
Conception
Salt Lake City, UT 84102

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Crossing at 9th
New Construction - 224,544 SF
Design
Salt Lake City, UT 84104

Sam's Club #6686-231 - RM
Renovation - 135,469 SF
Bidding
Salt Lake City, UT 84115

Millcreek Commons
Post-Bid
Less than $670,000 est. value
Millcreek, UT 84106

Sandy Park Center Retail Building
New Construction - 4,960 SF
Post-Bid
Less than $1,000,000 est. value
Sandy, UT 84070

Development of Property at 695 W. 5Th Ave/7555 S. Main Street
New Construction
Results
$1,000,000 to $5,000,000 CJ est. value
Midvale, UT 84047

The Residences at Sugar Alley
New Construction - 240,148 SF
Construction
$12,027,302 est. value
Salt Lake City, UT 84106

Mountain View Village Phase II
New Construction - 4,023,000 SF
Construction
Riverton, UT 98096

Anthem Commercial Lot 204
New Construction - 4,800 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Herriman, UT

Mixed Use Development
New Construction
Pending Verification
Murray, UT 84107

Transit Area Mixed Use
New Construction
Conception
Salt Lake City, UT 84111

Walmart Supercenter #5350-242 - OGP
Renovation - 108,996 SF
Design
Salt Lake City, UT 84117

Smith's Food & Drug Store #85
Renovation - 64,625 SF
Post-Bid
Midvale, UT 84047

Last Updated 01/24/2022 02:26 PM
Project Title

Walmart Supercenter #3568-232 - OGP-GB2

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84120   (Salt Lake County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Complete as of September 2019
Bids Due View project details and contacts
Estimated Value $37,760
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

ONLINE GROCERY PICKUP GOBACK 2

Details

1 Retail, 1 Story Above Grade, 850 to 1,000 SF Renovation.
Division 01 - General Requirements, Summary, Alternates, Project Management and Coordination, Construction Progress Documentation, Submittal Procedures, Regulatory Requirements, Quality Assurance, Quality Control, Testing Laboratory Services, Product Requirements, Owner-Furnished Products, Execution, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures.
Division 03 - Concrete, Structural Concrete.
Division 04 - Masonry.
Division 05 - Metals, Cold-Formed Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Door Hardware, Glazing.
Division 09 - Finishes, Gypsum Plastering, Resilient Flooring, Resilient Base and Accessories, Painting and Coating.
Division 26 - Electrical, Common Work Results for Electrical, Wiring Connections.
Division 27 - Communications.
Division 31 - Earthwork, Selective Clearing, Shoring.
Division 32 - Exterior Improvements, Paving Specialties.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents