Similar Projects
MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Kennebec Historical Society Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$250,000 CJ est. value
Augusta, ME 04330

Stroudwater Apartments
New Construction, Infrastructure - 45,000 SF
Design
$13,000,000 CJ est. value
Westbrook, ME 04092

Time & Temperature Building Project
New Construction - 202,000 SF
Design
$75,000,000 est. value
Portland, ME 04101

Ticonic Bridge Replacement - Waterville - Winslow, Region 2
Demolition, New Construction, Infrastructure
Bidding
$46,115,000 CJ est. value
Waterville, ME 04901

Raymond Park Fountain Repair
Infrastructure
Bidding
$15,000 CJ est. value
Lewiston, ME 04240

2022 Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

RFP Construction Manager at Risk - Front Street Redevelopment Construction Manager at Risk
Infrastructure
Post-Bid
$43,460,000 CJ est. value
Portland, ME 04103

Scattered Sites Redevelopment Construction Manager at Risk
Infrastructure
Results
$1,100,000 est. value
Portland, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Hobson's Landing - Master Plan - Phase 1&2
New Construction - 490,508 SF
Construction
$10,000,000 CJ est. value
Portland, ME 040101

Shipyard Brewery Redevelopment
New Construction, Demolition - 114,000 SF
Construction
$10,000,000 CJ est. value
Portland, ME 04101

The Lockwood Hotel
New Construction - 10,250 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Waterville, ME 04901

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

Last Updated 09/28/2022 12:43 PM
Project Title

Bluenose Inn

Physical Address View project details and contacts
City, State (County) Bar Harbor, ME 04609   (Hancock County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2022, the Site plan has been approved by the City of Bar Harbour. Architect information unknown. General Contractor selected. Construction is expected to begin later this Fall, 2022.

Details

4 Stories Above Grade, 9,725 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents