Similar Projects
Scale House Expansion and Rehabilitation - City of Copperas Cove
Addition, Demolition, Renovation, Infrastructure
Conception
$400,000 CJ est. value
Copperas Cove, TX 76522

Fire Station #3 Redesign and Expansion - City of Copperas Cove
Addition, Demolition, New Construction, Infrastructure
Conception
$850,000 CJ est. value
Copperas Cove, TX 76522

Crossroads Veterinary Boarding Building
New Construction, Infrastructure - 3,900 SF
Design
$800,000 CJ est. value
Copperas Cove, TX 76522

Murphy Oil #5664/#7883 / Copperas Cove
New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Copperas Cove, TX 76522

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

US0084 - Hot Mix
Infrastructure
Post-Bid
$247,000 est. value
TX

Veterans Avenue Sidewalk Improvements Project
Infrastructure
Post-Bid
$463,000 est. value
Copperas Cove, TX 76522

Winter Storm Roadway Repairs Project
Infrastructure
Results
$651,761 est. value
Copperas Cove, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Hampton Inn & Suites
New Construction, Infrastructure - 48,000 SF
Pending Verification
$4,000,000 CJ est. value
Gatesville, TX 76528

Martin Luther King Boulevard Drainage Improvements - DMP #: TR12 - City of Copperas Cove
Infrastructure
Pending Verification
$745,990 CJ est. value
Copperas Cove, TX 76522

Pecan Cove Drive Reconstruction - City of Copperas Cove
Infrastructure
Conception
$1,351,357 CJ est. value
Copperas Cove, TX 76522

SH 36 - Landscape Improvement
Infrastructure
Bidding
$260,435 CJ est. value
Gatesville, TX 76528

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

Last Updated 02/15/2023 10:43 AM
Project Title

Constitution Drive Reconstruction Project

Physical Address View project details and contacts
City, State (County) Copperas Cove, TX 76522   (Coryell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,354,453 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct 0.3 miles of Constitution Drive between MLK Jr. Drive and Bus 190 E. Construction will consist of removal of the existing asphalt and concrete curb and gutter and reconstructing in place with CRCP, Concrete Curb and Gutter and Sidewalk. All employees directly employed on the work shall be paid not less than the established prevailing wage scale for work of a similar character in this locality. A prevailing wage determination for the work has been included with the contract associated with this project and is incorporated therein for all purposes. The Contractor shall pay not less than the general prevailing wages as established by the U.S. Department of Labor and shall keep accurate wage records accessible in accordance with Chapter 2258, Texas Government Code. The City reserves the right to award the bid to either the lowest responsible bidder or to the bidder who provides goods or services at the best value for the City, in accordance with the Texas Local Government Code. Each bid must be accompanied by bid security made payable to the OWNER, in an amount of five percent (5%) of the BIDDER's maximum bid price and in the form of a Bid Bond issued by an acceptable surety, cashier's check, or certified check. It is further agreed by the Parties to this Contract that the contractor will execute separate performance and payment bonds, each in the sum of 100% of the total Contract price in standard forms for this purpose, guaranteeing faithful performance of the work and the fulfillment of any guarantees required and further guaranteeing payment to all persons supplying labor and materials of furnishing him any equipment in the execution of the Contract. These bonds shall also be subject to any provisions in the Supplemental General Conditions to this Contract. It is agreed that the Contract shall not be in effect until such performance and payment bonds are furnished and approved by the OWNER. The cost of the premium for the performance and payment bonds shall be included in the price bid by the Contractor for the work under this Contract, and no extra payment for such bonds will be made by the OWNER. All questions are due to Jordan Kiewit at jordan.kiewit@kimley-horn.com before 10/06/2022 at 12:00pm CST.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents