Similar Projects
Rocky Mountain Metropolitan Airport Taxiway Reconstruction - Jefferson County
Infrastructure
Conception
$3,053,510 est. value
Broomfield, CO 80021

Molholm Elementary - 2018 Bond - Jefferson County Public Schools
Addition, Renovation, Infrastructure
Conception
$6,409,000 CJ est. value
Lakewood, CO 80214

Walmart Supercenter #2293-240 - Smart Bundle
Renovation - 161,633 SF
Design
Evergreen, CO 80439

Walmart Supercenter #3824-276 - Smart Bundle
Renovation - 198,722 SF
Design
Westminster, CO 80003

Belmar - Lakewood
New Construction, Infrastructure - 379,578 SF
Bidding
$70,000,000 CJ est. value
Lakewood, CO 80226

Belmar - Lakewood
New Construction, Infrastructure - 379,578 SF
Bidding
$70,000,000 CJ est. value
Lakewood, CO 80226

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Walmart Supercenter #2293-237 - SPRB-R
Renovation - 161,633 SF
Construction
Evergreen, CO 80439

Jay Street Apartments
New Construction - 28,212 SF
Construction
$5,800,000 est. value
Lakewood, CO 80214

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

Bradford K-8 North Renovations - 2018 Bond -Jefferson County Public Schools
Infrastructure, Renovation
Conception
$475,000 CJ est. value
Littleton, CO 80127

Last Updated 04/14/2023 01:27 PM
Project Title

Avere on South Golden Mixed Use Development

Physical Address View project details and contacts
City, State (County) Golden, CO 80401   (Jefferson County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Multi-Family Homes, Parking Garage, Paving/Reconstruction, Retail, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $150,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a four-story building with space for commercial with residential units. A second smaller building with commercial and residential. 46 single-family attached townhomes. As of April 12, 2023, this project is under preliminary application for site development and has received rezoning approval from Jefferson County. Information regarding homebuilders or contractor has yet to be determined. Construction is anticipated to begin second quarter 2024.

Details

New Construction, New Construction. New Construction, New Construction. 42,525 SF, 770. New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents