Similar Projects
I-90/SR 261 EB and WB Bridges - Structure Rehabilitation
Infrastructure, Renovation
Conception
$5,169,000 CJ est. value
Moses Lake, WA 98837

I-90/SR 261 EB and WB Bridges - Structure Rehabilitation
Infrastructure, Renovation
Conception
$5,169,000 CJ est. value
Moses Lake, WA 98837

Priest Rapids Recreation Area Dredging and Bank Stabilization
Infrastructure
Design
$425,000 CJ est. value
Mattawa, WA 99349

I-90/Wilson Creek Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Design
$946,000 CJ est. value
Moses Lake, WA 98837

Milwaukee and Aerotec Water Mains
Infrastructure
Bidding
$600,000 CJ est. value
Moses Lake, WA 98837

Milwaukee and Aerotec Water Mains
Infrastructure
Bidding
$600,000 CJ est. value
Moses Lake, WA 98837

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

U-SE Road Overlay
Infrastructure
Results
$1,903,263 est. value
Ephrata, WA

Miscellaneous COF Upgrades
Infrastructure
Results
$470,000 est. value
Moses Lake, WA

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

I-90/Hamilton St EB Off-Ramp - Bridge Deck Repair
Infrastructure, Renovation
Conception
$2,701,000 CJ est. value
Moses Lake, WA 98837

Field House New Recreation Complex - City of Quincy
New Construction, Infrastructure - 140,000 SF
Design
$13,200,000 CJ est. value
Quincy, WA 98848

Westshore Biofilter Project
Infrastructure, Renovation
Bidding
$225,000 CJ est. value
Moses Lake, WA 98837

Last Updated 11/11/2022 10:18 AM
Project Title

SR 28/White Trail Rd - Roundabout

Physical Address View project details and contacts
City, State (County) Quincy, WA 98848   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,819,998 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Removing asphalt concrete pavement, roadway excavation, pigmented cement concrete pavement, planing bituminous pavement, hot mix asphalt, seeding and mulching, round about items, illumination system, pavement markings, traffic control and other work. 46 working days. Estimated value $2,000,000 - $2,500,000 WSDOT - SR 28/White Trail Rd - Roundabout *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Contract provides for the improvement of *** SR 28 MP 25.52 to MP 25.92 in Grant County, SR 28/White Trail Rd- Roundabout, by Clearing and Grubbing, Removal of Structures and Obstructions, Removing Asphalt Conc. Pavement, Removing Miscellaneous Traffic Item, Removing Monument Case, Cover, and Pipe, Roadway Excavation Incl. Haul, Common Borrow Incl. Haul, Embankment Compaction, Quarry Spalls, CL. V Reinf. Conc. Culv. Pipe 12 In. Diam., Catch Basin Type 1, Testing Storm Sewer Pipe, Schedule A Storm Sewer Pipe 12 In. Diam., Crushed Surfacing Base Course, Pigmented Cement Concrete Pavement,Corrosion Resistant Dowel Bar, Planing Bituminous Pavement, HMA Cl. 3/8 In. PG 64V-28,Commercial HMA, ESC Lead, Erosion/Water Pollution Control, Tackifier, Seeding and Mulching, Medium Compost, Project Area Weed and Pest Control, High Visibility Fence, Roundabout Splitter Island Nosing Curb, Roundabout Cement Concrete Curb and Gutter, Roundabout Central Island Cement Concrete Curb, Modified Truck Apron Cement Conc. Curb and Gutter, Cement Conc. Pedestrian Curb, Transportable Attenuator, Repair Transportable Attenuator, Flexible Guide Post, Tubular Marker, Plastic 12 Inch Wide Line, Grooved Plastic Line, Shoulder Rumble Strip Type 2, Permanent Signing, Temporary Pavement Marking- Short Duration, Illumination System No. 1 & 2, Portable Temporary Traffic Control Signal, Sequential Arrow Sign, Portable Changeable Message Sign, Flaggers, Other Traffic Control Labor, Traffic Control Supervisor, Construction Signs Class A, Plastic Wide Line, Shoring Curb Ramp Type Parallel A, Asphalt Curb Ramp, Detectable Warning Surface, Pigmented Cement Concrete Buffer, Adjust Cable Vault, SPCC Plan, Construction Geotextile for Permanent Erosion Control MBE (7.2%), WBE (6.9%) Job no- 23B003/3

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents