Similar Projects
Maple Street Industrial Addition
Addition, Demolition, Renovation, Infrastructure - 58,600 SF
Conception
$5,000,000 CJ est. value
Bellingham, MA 02019

Boylston Street Townhouse Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Brookline, MA 02445

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Bennett Lane Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Quincy, MA 02169

Pollard Locker Room
Renovation
Bidding
$650,000 CJ est. value
Needham, MA 02492

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

Excavation for Identification of Water Services
Post-Bid
$1,230,142 est. value
Boston, MA

South Middle School - General Bids
New Construction - 145,850 SF
Results
$72,331,417 est. value
Braintree, MA 02184

South Middle School - Filed Sub Bids
New Construction - 145,850 SF
Results
$72,331,417 est. value
Braintree, MA 02184

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Massapoag Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
S Weymouth, MA 02190

Factory Square Redevelopment
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Franklin, MA 02038

The Learning Experience / Franklin
New Construction, Infrastructure - 5,250 SF
Conception
$2,000,000 CJ est. value
Franklin, MA 02038

Sea Street Multi-Residential
Demolition, New Construction, Infrastructure - 39,962 SF
Design
$10,949,588 CJ est. value
Quincy, MA 02169

Last Updated 03/01/2023 01:33 AM
Project Title

RFQ Construction Manager at Risk- Tri-County Regional Vocational Technical High School, Franklin, Massachusetts

Physical Address View project details and contacts
City, State (County) Franklin, MA 02038   (Norfolk County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development, Vocational School
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Tri-County Regional Vocational Technical School District 147 Pond Street, Franklin, MA is accepting qualifications from Construction Managers to provide preconstruction and construction management services on a new Tri-County Regional Vocational Technical High School building project in Franklin, MA. The procurement process will follow M.G.L. c. 149A for CM at Risk Services, beginning with this Request for Qualifications. Preconstruction Services are expected to start in March 2023; if the project is approved construction is expected to begin in June 2024. Qualifications are sought from CM firms which have successfully completed project of similar scope, complexity, schedule and budget. For questions contact: Elias Grijalva at Dore & Whittier by email: Egrijalva@doreandwhittier.com, phone: (603) 867-7977. Estimated Budget: $230,000,000 to $250,000,000 The applicable minority workforce utilization percentage is 15.3 %. The applicable women workforce utilization percentage is 6.9 %. DVOBE and VBE participation on the project is 3%.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents