Similar Projects
Last Updated | 10/06/2022 08:55 AM |
Project Title | Seawall Repairs for Farragut, Robert Crown and Santee Basin, United Stated Naval Academy, Annapolis |
Physical Address | View project details and contacts |
City, State (County) | Annapolis, MD 21401 (Anne Arundel County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storm/Sewers |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $37,528,700 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 16, 2022 Contract Award Number: N4008022C0011 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: CIANBRO CORPORATION Contractor Awarded Address: Pittsfield, ME 04967 USA Base and All Options Value (Total Contract Value): $37528700.00 SEAWALL REPAIRS FOR FARRAGUT, ROBERT CROWN AND SANTEE BASIN, UNITED STATED NAVAL ACADEMY, ANNAPOLIS, MD THE NORTH AMERICA INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 237990 WITH A SIZE STANDARD OF $39.5M. CONTRACT TYPE: Firm Fixed Price TITLE: SEAWALL REPAIRS FOR FARRAGUT AND SANTEE BASIN, UNITED STATES NAVAL ACADEMY, ANNAPOLIS, MD 2. PROJECT DESCRIPTION: The work to be performed is to repair portions of the seawall at Farragut Field and Santee Basin at the Naval Academy in Annapolis, MD. The intent of the Seawall Repairs for Farragut Field and Part of Santee Basin project is to provide a 75-year service life by repairing the sheet pile bulkheads along Farragut Field and the east side of Santee Basin. The basis of design calls for the construction of a new sheet pile wall outboard of the existing. Santee Basin will utilize the existing tieback system while Farragut Field will utilize a new tieback system constructed inland of the existing for lateral stability. 3. POINT OF CONTACT: The primary point of contact for this procurement is ShaMarian Plummer at shamarian.n.plummer.civ@us.navy.mil. The secondary point of contact is Lindsay Brown at lindsay.m.brown14.civ@us.navy.mil. 4. DISCLOSURE OF MAGNITUDE: In accordance with DFAR 236.204 (ii), the estimated magnitude of construction is $25,000,000 and $100,000,000. 5. CONTRACT TYPE: Firm Fixed Price 6. ACQUISITION STRATEGY: Unrestricted Basis with Full and Open Competition Source Selection. 7. NORTH AMERICA INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: Classification System 237990 with a size standard of $39.5M 8. SOURCE SELECTION PROCESS: Best Value Source Selection (BVSS) Trade-Off. 9. CONTRACT COMPLETION DATE: Work under this contract shall commence 15 days after award and shall be completed within 730 days after contract award (this includes 15 days for bond approval). 10. PROPOSAL ACCEPTANCE PERIOD: The Offeror's proposal acceptance period is 90 days from the receipt of proposals. REQUEST FOR INFORMATION (RFI): Offerors are required to review the entire Solicitation package before submitting questions. All inquiries must be submitted May 27, 2022 by 2:00 PM EST. All inquiries must be submitted in writing, utilizing the Request For Information Form, and emailed ShaMarian Plummer shamarian.n.plummer.civ@us.navy.mil and Lindsay Brown lindsay.m.brown14.civ@us.navy.mil. No tables please. 13. DELIVERY OF PROPOSAL: Proposals shall be received electronically no later than 2:00 PM EST on 10 JUNE 2022. Proposals shall be submitted utilizing the Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE). Department of Defense (DoD) training for industry partners is available at https://dodprocurementtoolbox.com/site_pages/solicitation-module. Additional Web Based Training is available at https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml. Please send an email to shamarian.n.plummer.civ@us.navy.mil and lindsay.m.brown14.civ@us.navy.mil confirming submission of your proposal. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |