Similar Projects
Lively Tract Residential Development - Phase 4
New Construction, Infrastructure - 21,000 SF
Conception
$62,000 est. value
Georgetown, TX 78628

2022 Bond - Proposition B - Florence Independent School District
New Construction
Conception
$6,570,000 est. value
Florence, TX 76527

Georgetown Firing Range / City of Georgetown Police Department Training Facility
New Construction, Infrastructure - 15,545 SF
Design
$2,800,000 CJ est. value
Georgetown, TX 78628

Jarrell High School Expansion
Addition - 57,350 SF
Design
Jarrell, TX 76537

RFQ Construction Manager at Risk - Williamson County Headquarters
New Construction, Infrastructure
Bidding
$35,000,000 CJ est. value
Georgetown, TX 78626

Harmony Science Academy - Leander - Ground-Up Project
New Construction, Infrastructure - 75,701 SF
Bidding
$14,000,000 CJ est. value
Leander, TX 78641

Dollar General #24318 / Georgetown - Rebid
New Construction, Infrastructure - 10,640 SF
Sub-Bidding
$2,000,000 CJ est. value
Georgetown, TX 78626

Costco New Warehouse / Georgetown
New Construction, Infrastructure - 160,437 SF
Post-Bid
$13,260,000 CJ est. value
Georgetown, TX 78628

Harmony School Of Endeavor - Austin Restroom Renovation
Renovation - 420 SF
Post-Bid
$125,000 est. value
TX 78729

CMAR - RRISD Early College High School - ACC Round Rock
Results
$12,000,000 est. value
Round Rock, TX

Liberty Hill Elementary 6 - GMP 3
New Construction - 121,000 SF
Results
$38,500,000 est. value
Liberty Hill, TX

Holt Track Shop
New Construction, Infrastructure - 25,320 SF
Construction
$3,200,000 CJ est. value
Georgetown, TX 78628

Samsung Semiconductor Chipmaking Plant
New Construction, Infrastructure - 6,000,000 SF
Construction
$17,000,000,000 CJ est. value
Taylor, TX 76574

QuikTrip 4183
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, TX 78628

Black Rock Coffee / Georgetown
New Construction, Infrastructure - 1,887 SF
Pending Verification
$700,000 CJ est. value
Georgetown, TX 78628

Last Updated 09/23/2022 10:10 AM
Project Title

Hutto Middle School #3 - 95% CD

Physical Address View project details and contacts
City, State (County) Hutto, TX 78634   (Williamson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

BUDGET Hutto Middle School #3 - 95% CD 800 Haybarn Lane Hutto, TX 78634

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents