Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Warm Beach Water System Water Replacement
Infrastructure
Bidding
$2,000,000 est. value
Stanwood, WA 98292

Redundant Feed to Squak Mountain Project
Infrastructure
Bidding
$1,400,000 est. value
Issaquah, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

Evergreen Apartment Water System Consolidation
Infrastructure
Bidding
$248,000 est. value
Onalaska, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Libby Street Waterline Replacement
Term Contract
Bidding
$625,000 est. value
Clarkston, WA 99403

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

NE 45th St - NE 106th Ave to NE 109th Ave Water Main Replacement
Infrastructure
Bidding
Vancouver, WA 98668

Reported 02/04/2022 12:00 AM
Project Title

2022 Waterline Replacements

Physical Address View project details and contacts
City, State (County) Anacortes, WA 98221   (Skagit County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work Provided for this project will include all materials, equipment, labor and related items necessary to install approximately 4350 LF of 8 ductile iron water main and 572 LF of 2 munixipex make tie-ins to the existing water system, reconnect to excisting fire hydrants, renew/reconnect existing water services, and other work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents