Similar Projects
Hurricane and Storm Damage Risk Reduction
Term Contract
Design
$5,000,000 to $10,000,000 est. value

Bayou Chene Flood Protection Structure Phase 4B
Infrastructure
Post-Bid
Morgan City, LA

Bayou Teche Flood Control Structure Phase 2
Infrastructure
Post-Bid
$90,400 est. value
Morgan City, LA

Yokely Levee Extension
Infrastructure
Results
Morgan City, LA

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Results
$10,000,000 est. value

Atchafalaya River Levees, St. Mary Levee District, Charenton Floodgate Replacement
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
LA

LA 182 0.45 MI S LA 3069 - LA 317
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

2022 District 12, 13, 14 Road Improvements
Infrastructure
Post-Bid
$1,366,416 est. value

Asphaltic Concrete Roadway and Drainage Improvements to East Martin Lither King Road
Infrastructure
Results
$742,000 est. value
Charenton, LA 70523

2022 District 7, 9 Road Improvements
Infrastructure
Post-Bid
$1,797,697 est. value

M/V New Roads - 2021 Uscg Drydock
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Water oak Drainage
Alteration
Post-Bid
$17,140 est. value
Slidell, LA 70458

Asphaltic Concrete Roadway Improvements to Saint Peters Road
Infrastructure
Results
$852,700 est. value
LA

Reported 04/28/2022 12:00 AM
Project Title

Youngswood Facility (InterMoor) Yard Surface Replacement

Physical Address View project details and contacts
City, State (County) Morgan City, LA 70380   (Saint Mary County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer - 03/30/22
Owner View project details and contacts
Architect View project details and contacts
Description

Heavy construction including excavating approximately 36 inches of materials and installing 36 inches of 610 limestone with 2 layers of triaxial geogrid and 1 layer of filtergrid. Subsurface drainage improvements include replacing an existing 30-inch diameter PVC pipe with a 30-inch diameter reinforced concrete pipe, installing a catch basin, slope area to drain and other incidental work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents