Similar Projects
CAMP - EC Sanitary Sewer Repair
Post-Bid
Less than $200,000 est. value
Boulder, CO 80309

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

Goose Creek Interceptor Pipeline Replacement/Rehabilitation Project
Post-Bid
Less than $4,200,000 est. value
Boulder, CO 80304

2020 Manhole Rehabilitation Project
Results
Boulder, CO

Resilient St Vrain Project: Izaak Walton Reach 1 – Utility Relocations
Results
Less than $2,280,000 est. value
Longmont, CO

Grease and Septic Pumping Services
Post-Bid
Boulder, CO

CAMP - Repair Culverts West of Kitt West
Post-Bid
Less than $100,000 est. value
Boulder, CO 80303

Sundar Development Infrastructure Extension
Results
Lafayette, CO 80026

Westerly Filing 1 Sanitary and Storm Sewer and Water Utilities Project
Results
CO

On Call as Needed Septic Tank and Vault Toilet Cleaning
Bidding
Longmont, CO

North Public Road Sanitary Sewer Main Extension
Post-Bid
Lafayette, CO 80026

2020 CIPP Sewer Lining Project
Results
Less than $362,175 est. value
Louisville, CO 80027

Public Improvements within Phase 2 of The Point Redevelopment Project
Post-Bid

Ultra Violet (UV) Cured-in-Place-Pipe (CIPP) Lining
Term Contract
Bidding
Broomfield, CO

Last Updated 03/19/2021 12:25 PM
Project Title

Miller Sanitary and Reuse Pipelines

Physical Address View project details and contacts
City, State (County) Lafayette, CO   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,427,052
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will be completed in Section 27, Township 1 North, Range 69, between the Bullhead Gulch Lift Station and State Highway 7 (Arapahoe Road), west of US Highway 287 (107th Street). The Work includes, but is not necessarily limited to furnishing labor, materials and equipment for the construction of the following: Connection to existing 16-inch PVC sanitary sewer near the Bullhead Gulch Lift Station. Installation of approximately 2,630 LF of 10-inch PVC sanitary sewer and manholes. Installation of approximately 2,780 LF of 18-inch PVC non-potable water lines. Trenchless auger bore installations of approximately 100 LF each of 10-inch PVC sanitary sewer and 18-inch PVC non-potable water line with steel casings under State Highway 7 (Arapahoe Road). Installation of 8-inch water meter in precast concrete vault for irrigation use. All other items necessary to complete the project including traffic control, seeding, planting, erosion control, and other items as detailed in the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents