Similar Projects
Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Brickell Gateway Tower
New Construction - 854,902 SF
Conception
$150,000,000 est. value
Miami, FL

One Bayfront Plaza
New Construction - 3,300,000 SF
Design
$10,000,000 CJ est. value
Miami, FL 33139

Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

42 Pine Street Apartments
New Construction - 168,691 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Miami Beach, FL 33140

Legacy Hotel & Residences
New Construction - 1,013,840 SF
Post-Bid
Miami, FL 33132

Work Order Contract 2020- North Area
Results
Less than $4,000,000 est. value
FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

The Watermark at Merrick Park
New Construction - 256,917 SF
Construction
$21,500,000 est. value
Coral Gables, FL 33146

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Brownsville Transit Village - Phase V
New Construction - 99,854 SF
Design
$26,711,893 est. value
Miami, FL 33142

Miami Riverside Center
New Construction - 6,000,000 SF
Construction
$80,000,000 est. value
Miami, FL

One Brickell City Centre
New Construction - 743,768 SF
Design
$1,000,000,000 est. value
Miami, FL

Markers Grove Isle
New Construction, Renovation - 126,350 SF
Construction
$10,000,000 est. value
Coconut Grove, FL

3900 Alton
New Construction - 280,786 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL 33140

Last Updated 06/06/2022 11:18 AM
Project Title

Hibiscus Grove

Physical Address View project details and contacts
City, State (County) Cutler Bay, Perrine, FL 33157   (Miami-Dade County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Fitness Center, Retail
Contracting Method Bids by Invitation.
Project Status Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, Approximately 2,600 SF Build-Out, Fitness Center, Apartments/Condominiums, New Construction, 270 Unit(s), 151 Parking Spaces, Clubhouse/Social Club.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents