Similar Projects
CPS Falconer ES Gym Floor
Renovation, Alteration - 5,500 SF
Post-Bid
Chicago, IL 60641

Seascape Pool Floor
Alteration
Post-Bid
Hoffman Estates, IL 60169

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

N072--Removal and Replacement of Existing Flooring
Term Contract
Results
Chicago, IL 60612

Flooring Replacement
Alteration
Post-Bid
Chicago Ridge, IL 60415

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Flooring Replacement at Andrew, Sandburg and Stagg High Schools
Alteration
Post-Bid
Orland Park, Palos Hills, Tinley Park, IL 60487

Construction Services for carpet, floor, wood concrete and sub-floor
Alteration
Results
Chicago, IL 60661

Carpet Replacement
Alteration
Post-Bid
Elk Grove Village, IL

Furnish and Installation of Flooring
Alteration
Results
IL

2022 Floor Tile Abatement
Alteration
Post-Bid
La Grange, IL

Highcrest Middle School Flooring
Alteration
Results
$200,000 est. value
Wilmette, IL 60091

2022 Cutting Hall and Falcon Recreation Center Carpet Replacement
Alteration
Post-Bid
Arlington Heights, IL

Gymnasium Floor
Alteration
Results
$100,000 est. value
Chicago, IL 60632

Master Facility Plan
Demolition, Alteration
Post-Bid
Park Ridge, IL

Last Updated 03/23/2023 11:35 PM
Project Title

Bell ES - Carpet tile & commercial carpet replacement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60618   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $98,485 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bell Elementary School - Carpet replacement Questions Due Date: Feb 23rd 2023, 2:30 PM CST Pre-Qualified Contractor Opportunities 1) Remove current carpeting in Classrooms 308, 306B, 303, 208, 216, 313,315,316,317, and 318 Est sq. Yd 801 and 1st floor corridor Est Sq. Yd. 712 Total sq. yd for classrooms and corridor is 1513 sq. Yd 2) Staff to remove all furniture and items from the classrooms and 1st floor corridor. 3) Apply diamabrush to floors. 4) Vendor to vacuum all classrooms floors listed and 1st floor corridor. 5) Vendor to apply adhesive for carpet tile to entire floor in assigned classrooms and 1 st floor corridor. 6) Contractor to use 100 lb. roller over entire floor in classrooms. 7) Vendor to furnish Carpet tile (24x24) 8) Vendor to provide samples for the school 9) Furnish and install new commercial carpet in 1st floor corridor equal quality as existing carpet. 10) Area to be cleaned a upon completion and vendor to dispose of all trash. 11) Vendor will use proper tools and equipment to provide a safe workplace. 12) Vendor will supply all materials and labor. 13) Contractor to secure necessary permits. 14) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 15) Not responsible for contractor errors as a result of non-field verification. 16) Materials and installation must comply with CPS Standards and Specifications as listed on 17) Section 09 68 13 Tile carpeting 18) Secure job site overnight if work is not completed in one day. 19) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 20) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 21) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 22) Contractor is to remove and dispose of materials torn out and any construction debri

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents