Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Starbucks #70593 / San Bernardino - Revised
New Construction, Infrastructure - 1,005 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Carbon Canyon Water Recycling Facility (CCWRF) Asset Management and Improvements Project
Infrastructure, Renovation
Bidding
$25,500,000 CJ est. value
Chino, CA 91710

O'Reilly Auto Parts (CL2) / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts (CL2) / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

Last Updated 01/10/2023 04:05 PM
Project Title

Construction of B Street Pavement Reconstruction, Intersection Accessibility

Physical Address View project details and contacts
City, State (County) Chino, CA 91710   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $175,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 11/08/2022 at 5:00 PM PT Start/Delivery Date February 2023 Project Duration 20 working days after NTP issued Furnish all labor, materials and equipment to: Remove and dispose of existing PCC and AC pavement per the Project Plans. Construct 5 AC pavement over 6 of compacted aggregate base, 2 cold plane, traffic pavement markings, PCC sidewalk, curb ramps, cross gutter and curb and gutter per Project Plans. All questions or requests for interpretation regarding this bid solicitation must be submitted online through PlanetBids before 5 p.m. on November 8, 2022

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents