Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Water Treatment Plant No. 2 Treatment and Disposal Improvements Design Package 2 - Deep Injection Well
Bidding
FL

Construction of Wells 4 and 5
Infrastructure
Bidding
Less than $101,000 est. value
Lady Lake, FL

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Lift Station 5 Replacement Pumps
Post-Bid
South Daytona, FL 32121

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Oak Meadows Water Supply Facility Well Houses
Results
Less than $2,000,000 est. value
Orlando, FL 32835

Owner Occupied Rehabilitation - 4212 West 4th Street
Renovation
Bidding
Lehigh Acres, FL 33971

Sump Pump
Post-Bid
Lakeland, FL 33801

Aquifer Recharge at Flatford Swamp
Results
FL

Removal and Installation of Surge Pumps
Infrastructure
Bidding
$35,000 est. value
Casselberry, FL 32707

Coral St LS45 Pump Replacement
Post-Bid
Navarre, FL 32566

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Portable Generator and Bypass Pump Rentals
Term Contract
Bidding
Gulf Breeze, FL

Pump W/1" NPT Ports
Post-Bid
Lakeland, FL

Last Updated 07/27/2021 11:37 AM
Project Title

Potable Water Well - 15

Physical Address View project details and contacts
City, State (County) Palm Coast, FL   (Flagler County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $410,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Outfitting of a recently constructed potable water well in the Upper Floridian Aquifer. Construction includes the furnishing and installation of a submersible well pump, mechanical piping, site work, fencing, electrical and instrumentation. Alternate bid items include approximately 900 LF of 12” raw water main installed within the Citation Blvd. right-of-way from the well site to the City’s existing raw water main.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents