Similar Projects
6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

11th Avenue South East and 5th Street Sanitary Sewer and Storm Sewer Improvements
Conception
$110,000 est. value
Cedar Rapids, IA 52407

SE Des Moines Pump Station Rehab
Alteration
Design
$5,000,000 to $10,000,000 est. value
Des Moines, IA

Douglas to Jackson Drainage Basin Improvements - 549-145 - City of Sioux City
Infrastructure
Design
Less than $5,300,000 est. value
Sioux City, IA 51104

Country Club View Subdivision - Plat 1 Paving, Water Main, Sanitary Sewer And Storm Sewer
Infrastructure
Bidding
$1,627,520 est. value
Washington, IA

Prairie View Drive and Ashworth Road Intersection Improvements
Infrastructure
Bidding
$454,055 est. value
West Des Moines, IA 50266

6th Street South West from Capital Drive to 800 South of Commerce Park Drive
Post-Bid
$2,180,000 est. value
Cedar Rapids, IA 52404

BCRC Detention & Support Parking Site Prep
Build-Out, Infrastructure
Post-Bid
Johnston, IA

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Sanitary Sewer South of East Avenue/ West of 80Th Street
Conception
$830,000 est. value
Cedar Rapids, IA 52407

2022 Street Improvements
Infrastructure
Post-Bid
Woodbine, IA

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

E Avenue North West W/O 28th Street Storm water Detention Basin
Conception
$535,000 est. value
Cedar Rapids, IA 52407

Last Updated 07/08/2022 06:11 AM
Project Title

2022 Aspen Grove Storm Sewer Improvements

Physical Address View project details and contacts
City, State (County) Burlington, IA   (Des Moines County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $65,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to repair a portion of the stormwater system within Aspen Grove Cemetery that conveys storm water generated within City Limits. These repairs will be made per City Contract No. 7903 dated September 3, 2021 between the Aspen Grove Cemetery and the City of Burlington. Storm improvements will result in the installation of 18 LF of 4' x 3'concrete box culvert, removal and reinstallation of 190 LF of 36" HDPE pipe, and installation of 2 precast concrete storm structures.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents