Similar Projects
CSO 1 Elimination
Post-Bid
Kokomo, IN 46901

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Collection System Improvements
Results
New Palestine, IN 46163

SR8 and CR19 Sanitary Sewer Extension
Results
Garrett, IN

Brownsburg Sanitary Sewer Improvements
Post-Bid
Brownsburg, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Market Survey/Sources Sought for Construction Work at City of Portage Sewer Interceptor Rehabilitation, In Porter County, Portage, Indiana
Post-Bid
$1,000,000 to $5,000,000 est. value
Portage, IN

I-65 Utility Extensions Division A
Results
DeMotte, IN

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

Murray Sanitary Sewer
Results
Less than $2,267,155 est. value
Bluffton, Murray, IN

West Side Interceptor Improvements, Division A
Post-Bid
Richmond, IN

Liberty Center Sanitary Sewer
Results
Less than $3,531,060 est. value
Bluffton, Liberty Center, IN

Camp Atterbury Water Utilities Phase 2
Post-Bid
Edinburgh, IN 46124

Ewing Lane Sanitary Sewer Phase 2 - Gravity Sewer Along 8th Street, Arctic Springs Pump Station and Ewing Lane Force Main
Results
Jeffersonville, IN 47130

Dyer Water/Sanitary Board Water Supply and Distribution System Improvements Contract 4
Post-Bid
Dyer, IN 46311

Last Updated 05/26/2022 03:48 PM
Project Title

Spurgeon Lift Station and Force Main

Physical Address View project details and contacts
City, State (County) Lynnville, IN 47619   (Warrick County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a lift station near the Town of Spurgeon, approximately 5 miles of horizontal directionally drilled 6-inch force main, and tie in to the Lynnville Wastewater Treatment Plant. The work includes all dewatering, traffic control, temporary erosion and sediment control, surface restoration, and all other work required to make fully complete and operational system.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents