Similar Projects
AHU Replacement
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Salisbury, NC 28144

North Piedmont CRV Return Air Duct Cleaning
Alteration
Bidding
Lexington, NC 27292

HVAC and Electric Renovation of the Courthouse
Post-Bid
$400,000 to $600,000 est. value
Trenton, NC 28585

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

Legacy and Jones Residence Halls Make-up Air
Results
Less than $1,655,170 est. value
Greenville, NC

EMD Facility HVAC Upgrades
Results
Wilmington, NC

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Replacement of Three HVAC Units
Alteration
Bidding
Brevard, NC

Request for Proposal for HVAC and Electrical Design and Consulting Services Andrew Carnegie Library
Post-Bid
Salisbury, NC 28144

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

HVAC Renovation Badin Elementary School
Alteration
Bidding
Badin, NC 28009

CTC Computer Room Air Conditioner
Term Contract
Post-Bid
Archdale, NC 27263

Nature Exploration Center (NEC) Building HVAC Control System Replacement
- 200,000 SF
Results
Less than $1,090,000 est. value
Raleigh, NC 27601

Mulberry Elementary School Hvac Replacement
Infrastructure
Bidding
$700,000 est. value
North Wilkesboro, NC 28659

Reported 03/05/2022 12:00 AM
Project Title

Greenwood Middle School HVAC Improvements

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27534   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and install the following equipment on the school/s Annex Classroom Building. The existing condensing units are currently located on the Annex building’s roof. It is requested that the new condensing units be relocated to ground level. Pour four concrete pads for condensers to sit on. We will handle the electrical for all equipment. (4) Trane 10 Ton split HVAC units: 1. Indoor Air handler- Model number (TWE12043AAA-A) 2. Outdoor Unit- Model number (TTA12044CAA-AS) 3. Duct new unit into the duct work in floor 4. Demo and remove existing equipment and electrical as required. 5. Disposal of the existing equipment as required to meet the EPA guidelines. 6. Install new air handlers in mechanical rooms and relocate new condensing units on ground level. 7. Install new line sets for all 4 split systems Provide and install the following equipment for the school’s Cafeteria: (3) Trane heat pumps units Model number (4WHC4036-5000) and (1) Trane Heat pump Model Number (4WCH4036-1000): 1. Demo and remove existing equipment and electrical as required. 2. Disposal of the existing equipment as required to meet the EPA guidelines. 3. Install new AC units on roof in place of existing units. 4. Provide and install new programmable thermostats for each unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents