Similar Projects
RFQ For Asphalt and Concrete Repair
Post-Bid
Germantown, MD

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Highway Maintenance Contract Support at Various Locations in Montgomery County
Results
$1,000,000 to $2,500,000 est. value
MD

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Street Repair and Maintenance
Infrastructure
Post-Bid
Chevy Chase, MD

Requirements Contract for Asphalt Paving, Patching, Milling and Related Maintenance Work
Results
$1,000,000 to $1,500,000 est. value
Rockville, MD

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Micro-Surfacing and Crack Sealing at Various Locations
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
Gaithersburg, MD

CIP Work Order Contract
Term Contract
Results
Rockville, MD

North Washington Street And East Middle Lane Road Diet Project
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Rockville, MD 20850

Street Repair and Maintenance
Term Contract
Results
Chevy Chase, MD

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Roadway Resurfacing, Curbs Sidewalks and Miscellaneous Appurtenances
Term Contract
Results
Less than $1,500,000 est. value
Gaithersburg, MD

Pavement Maintenance
Term Contract
Results

Last Updated 06/15/2022 11:04 AM
Project Title

Quince Orchard Boulevard Reconstruction Storm Water Management - SW00017 - City of Gaithersburg

Physical Address View project details and contacts
City, State (County) Gaithersburg, MD 20878   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $755,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will support the design and construction of corresponding stormwater management for the Quince Orchard Boulevard reconstruction project (Project #000034). The scope of the project is to provide enhanced stormwater treatment by replacing existing green street facilities along Quince Orchard Boulevard and Rabbitt Road with upgraded Stormwater facilities capable of treating the increase in impervious area from the reconstruction project. Construction is scheduled for FY23. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of June 14, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents