Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

HMA Overlay Minor Structural
Infrastructure
Conception
$675,000 est. value
Centerville, IN

2022-1 CCMG Community Crossings Paving Program Re-bid
Infrastructure
Design
$878,098 CJ est. value
Farmersburg, IN 47850

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 CJ est. value
Crown Point, IN 46307

Bike/Pedestrian Facilities
Infrastructure
Bidding
$617,750 CJ est. value
Fishers, IN 46040

Asphalt Resurface
Infrastructure
Bidding
$2,271,234 CJ est. value
Swayzee, IN 46986

Asphalt Paving and Site Improvements
Post-Bid
Indianapolis, IN 46214

Duke Energy Relocation Plans Phase 2 North
Alteration
Post-Bid
Carmel, IN

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

East Mall Phase 2B Site Improvements
Results
Muncie, IN

Remington Subdivision
New Construction, Infrastructure
Pending Verification
$465,500,000 CJ est. value
Fishers, IN 46038

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Drainage Ditch Correction
Alteration
Design
$528,000 est. value
Paoli, IN 47454

Asphalt Resurface
Infrastructure
Bidding
$2,199,120 CJ est. value
Madison, IN 47250

Indian Creek HS Fieldhouse, Auditorium, Sports Tower
Addition
Post-Bid
Trafalgar, IN 46181

Last Updated 08/30/2022 10:03 AM
Project Title

Lakeside Drive Water Main Loop

Physical Address View project details and contacts
City, State (County) Syracuse, IN 46567   (Kosciusko County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 30,2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the following Work: The project includes but is not limited to the installation of approximately 1,500 LF of new 8-inch water main along Lakeside Drive with connections to the existing distribution system at Palm Drive and Pickwick Road, inclusive of all valves, fittings, service taps, and other work required for the complete construction of the new water main to serve the Town of Syracuse. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. NO bid may be withdrawn after the scheduled closing time for receipt of bids for at least 60 days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents