Similar Projects
HVAC Services - All Schools
Term Contract
Sub-Bidding
$180,000 CJ est. value
Billerica, MA 01821

DPW Combined Boiler Repair and Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Somerville, MA 02145

J045--Perform Duct Cleaning Services
Term Contract
Post-Bid
Bedford, MA 01730

HVAC Maintenance Services
Term Contract
Post-Bid
$300,000 est. value
Tyngsborough, MA

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Bathroom Exhaust Fans, Tannerville 667-1 & 667-2 - General Bids
Alteration
Results
$196,000 est. value
Reading, MA 01867

Police H.V.A.C. Repair Project
Renovation
Construction
$89,932 CJ est. value
North Reading, MA 01864

Capen Court - Senior housing (667-1) Chiller Replacement
Renovation
Construction
$234,300 CJ est. value
Somerville, MA 02144

Rooftop Unit Replacement
Renovation
Sub-Bidding
$275,000 CJ est. value
Westford, MA 01886

Furnish Outdoor Air System
Alteration
Post-Bid
Lowell, MA

Masonic Hall Town Hall Chiller and Other Projects
Alteration
Results
$2,000,000 est. value
Billerica, MA

Annual Maintenance and Service HVAC and Plumbing Systems
Term Contract
Post-Bid
$240,000 est. value
Boston, Dedham, Everett, Newton, Revere, Somerville, MA

Replacement of a Rooftop 35 Ton HVAC Unit
Alteration
Results
$150,000 est. value
Littleton, MA 01460

Purchase and Delivery of One (1) Air Handling Unit and One (1) Air Cooled Condensing Unit
Alteration
Post-Bid
Lexington, MA 02421

FMC Devens- Water Treatment Services
Term Contract
Results
Ayer, Devens, MA 01434

Last Updated 05/03/2023 02:06 PM
Project Title

Bedford Public Library HVAC Replacement and Upgrades - Sub Bid

Physical Address View project details and contacts
City, State (County) Bedford, MA 01730   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,087,700 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Bedford, Massachusetts Select Board, hereinafter called the 'Awarding Authority', will receive sealed bids from DCAM qualified contractors, addressed to the Bedford Facilities Department, 101 McMahon Road Bedford, MA 01730. The plans and specifications, hereinafter called the 'Project Manual' as prepared by the Awarding Authority, Northeast Engineering & Commissioning Services, and Bartick Design Studio, describe the project for the Bedford Public Library HVAC Systems Renovations at 7 Mudge Way, Bedford. Bidding procedures shall be in accordance with Massachusetts General Laws, Chapter 149. The Scope of Work is to demo the existing HVAC and associated equipment as well as any associate construction work and furnish and install a new HVAC system as well as any associated construction work, per the attached plans and specifications. All work will be phased as the building will be occupied. The apparent low bidder must also furnish to the Awarding Authority a copy of the Contractor Qualification Statement referenced by the Update Statement furnished with the bid documents. SUB-TRADE INFORMATIONThe results will be issued as an addendum no later than 48 hours prior to the General Bid opening. Each Sub Bidder must submit with their bid, both a current Certificate of Eligibility, as issued by the Division of Capital Asset Management, Commonwealth of Massachusetts, showing approval for the size and nature of the project herein advertised, and an Update Statement current as of the date of the bid, in order to be considered for this project. The apparent low bidder must also furnish to the Town a copy of the Contractor Qualification Statement referenced by the Update Statement furnished with the bid. SUB-TRADES: HVAC All bids must be accompanied by a bid security in the form of a certified, treasurer's or cashier's check, drawn upon a responsible bank, or a bid bond, each in the amount of five percent (5%) of the total bid price, payable to the Town of Bedford. A Performance Bond, as well as a Labor and Materials or Payment Bond, each in such a form as prescribed in the Instructions to Bidders and acceptable to the Awarding Authority, will be made part of the Contract with the General Contractor who shall be awarded this Bid. All bonds must be drawn for One Hundred Percent (100%) of the Total Contract Price. Bids are subject to M.G.L. c149 A,A44A-J, as amended, and to minimum wage rates as required by M.G.L. c149 A,A26 to 27D inclusive. The Awarding Authority reserves the right to waive irregularities and to reject, at its discretion **Sub Bid Date and time (03/13/2023 at 11:00 AM ET)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents