Last Updated | 09/28/2022 09:49 AM |
Project Title | Bettendorf High School Cooling Tower Installation |
Physical Address | View project details and contacts |
City, State (County) | Bettendorf, IA 52722 (Scott County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $132,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. This section applies to all work under the plumbing contract. This shall include, but not necessarily be limited to, the following: 1. Hot and Cold Water Distribution System B. The work shall include all materials, equipment and labor required for complete and properly functioning plumbing systems. C. Drawings for plumbing work are in part diagrammatic, intended to convey the scope of work and indicate general arrangement of equipment, piping and approximate sizes and locations of equipment and materials. D. Where job conditions require reasonable changes in indicated locations and arrangements, make such changes without additional cost to Owner. E. Because of the scale of the drawings, certain piping or items such as unions or fittings may not be shown, but where such items are required by other sections of the specifications, or where they are required by the nature of the work, they shall be furnished and installed. F. All elements of the construction shall be performed by workmen skilled in the particular craft involved, and regularly employed in that particular craft. G. All work shall be performed in a neat, workmanlike manner in keeping with the highest standards of the craft. PROJECT DESCRIPTION: Installation of Owner Furnished cooling tower. BID SECURITY: Bid Bond or Certified Check in the amount of Five Percent (5%) of the Proposal. PERFORMANCE BOND AND LABOR Bond required - the successful contractor shall AND MATERIAL PAYMENT BOND provide a Performance Bond & Labor & Material Payment Bond. SUBSTITUTION REQUESTS No requests for substitution or clarification AND QUESTIONS: questions will be answered after Monday, September 12th, 2022 at 4:00 PM Local Time. CONSIDERATION OF BIDS: The Owner reserves the right to reject any or all bids, to waive any irregularities in the bids received and to accept the bid which, in the Owner's judgment, is in the Owner's best interests. All requests for substitution or questions shall be directed to Mr. Pratt via e-mail at curtpratt@bettendorf.k12.ia.us. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |