Similar Projects
Swing Check Valves Repair - Utilities
Post-Bid
Largo, FL 33778

Equipment Calibration, Repair, and Replacement - Utilities
Post-Bid
FL

Force Main Air Release Valve Replacement Highland Lakes Area
Results
Less than $784,230 est. value
Clearwater, FL 33755

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Force Main 8 Replacement
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

SR-580 Water Main Tie-Ins
Results
Less than $341,286 est. value
Dunedin, FL 34698

Utility Locate Services
Infrastructure
Post-Bid
Clearwater, FL

Water Main Improvements at ALT US 19 to Omaha Street Delaware Avenue to Nebraska Avenue (PID 004017A)
Results
Less than $1,399,413 est. value
Palm Harbor, FL 34683

County Road 95 Force Main Replacement and Relocation
Infrastructure
Post-Bid
$814,985 est. value
Clearwater, FL

Espiritu Santo Springs and Washington Brennan Subdivisions Water Main Replacement Project
Results
Less than $1,890,000 est. value
Safety Harbor, FL

Philippe Pointe Pedestrian Bridge Water Main Project
Infrastructure
Post-Bid
$565,000 est. value
Safety Harbor, FL

Shore Acres Water Main Replacement
Results
$1,600,000 est. value
Saint Petersburg, FL 33731

Utility Rehabilitation and Construction Services
Term Contract
Results
Tarpon Springs, FL 34688

Construction of Harbor Palms Infrastructure Project Phase 2
Results
Oldsmar, FL

Coating of 36 Inch Wtm; Restoration of Potable/Reclaimed Water Mains
Results
Saint Petersburg, FL

Reported 08/26/2021 12:00 AM
Project Title

Philippe Pointe Pedestrian Bridge Water Main Project

Physical Address View project details and contacts
City, State (County) Safety Harbor, FL   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Capital Improvement Project, Philippe Pointe Pedestrian Bridge Water Main Project, which include, but not limited to, in general the following work as set forth more fully in the scope of work and specifications in this solicitation: 1. Installation of 8-inch C-900 PVC DR-18 water main by open cut; 2. Installation of 8-inch C-900 PVC DR-18 water main by subaqueous horizontal directional drill; 3. Installation of locate stations; 4. Abandonment of existing water main; 5. Restoration of curb, driveways, sidewalks and site restoration; 6. Installation of road base, asphalt pavement, and concrete sidewalk and curbing; 7. Maintenance of Traffic

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents