Similar Projects
Sidewalk and Drainage Improvements
Infrastructure
Bidding
Saint Charles, MO

Replace Culvert
Infrastructure
Bidding
$100,000 to $250,000 est. value
MO

Forest Park Waterway
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Elson Street Culvert Replacement
Results
Kirksville, MO

Corby Pond Restoration
Results
Saint Joseph, MO 64506

Bridge Replacement and Culvert Replacement
New Construction, Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
MO

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

Sediment Removal from Primary Drainage Ditches
Infrastructure
Bidding
MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Sediment Removal from Primary Drainage Ditches
Infrastructure
Bidding
Rushville, MO 64484

Parking Lot Regrading and Drainage Project
Infrastructure
Post-Bid
Gower, MO

Metal Pipe (CMP and Arch Pipe)
Results
MO

Reported 12/17/2021 12:00 AM
Project Title

Reinforced Concrete Pipe , Bell and Spigot Joint Class 4 and 5

Physical Address View project details and contacts
City, State (County) Fulton, MO 65251   (Callaway County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents