Similar Projects
Duluth`s United Health Group Building
Renovation - 170,000 SF
Conception
$16,000,000 est. value
Duluth, MN 55811

Babcock Trail Apartments
New Construction - 67,766 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Inver Grove Heights, MN 55077

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

Lake Minnetonka Care Center
Demolition - 17,983 SF
Design
Minnetonka, MN 55345

EHRM Infrastructure Upgrades
Renovation
Bidding
$25,000,000 to $500,000,000 est. value
Minneapolis, MN 55417

Metropolitan Wastewater Treatment Plant (MWWTP) Services Buildings and Site Improvements - Step 2
Renovation, Infrastructure - 40,000 SF
Bidding
$35,000,000 est. value
Saint Paul, MN 55106

Inspection and Cleaning of Sanitary and Storm Water Piping
Term Contract
Post-Bid
Moorhead, MN 56563

Talahi and Kennedy Site Improvements 2021
Post-Bid
Waite Park, MN

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction
Renovation - 156,816 SF
Results
Cloquet, MN 55720

Capital Improvement Project Maintenance/Repairs 2021
Results
$460,000 est. value
Little Canada, MN

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Erik's Transmission
New Construction - 1,056 SF
Construction
MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Dental Office
Addition - 3,105 SF
Pending Verification
Minneapolis, MN 55413

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Reported 06/14/2022 09:27 AM
Project Title

Health and Wellness Addition - Staples-Motley School District

Physical Address View project details and contacts
City, State (County) Staples, MN   (Todd County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of June 13, 2022, this project is included in the Phase One School Improvement Plan. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Medical Office/Outpatient, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents