Similar Projects
New Bridge - North Coast Harbor Ped Br
Results
Cleveland, OH

Bridge Repair -BH FY 2018 (West)
Results
Akron, Cuyahoga Falls, Fairlawn, OH

Bridge Deck Sealer
Term Contract
Results

Bridge Repair - BH-FY19 (D)
Results

Mill Creek Bridge Repairs
Results
Less than $405,072 est. value
Cincinnati, OH

2018 Bridge Improvements Paulding County
Results
Less than $279,030 est. value
Paulding, OH

2018 Grimes Road Prestressed Bridge Beams
Results
Less than $54,600 est. value
Georgetown, OH

Rehabilitation of the Winton Road Bridge (B-0673)
Results
Less than $1,190,503 est. value
Cincinnati, OH

Perry Street Bridge Waterline Hanger Support Replacement and Spot Repair
Results
Less than $51,747 est. value
Napoleon, OH

Bridge Repair - Bridge Maintenance FY2019
Results

New Burlington Road Bridge #36-1.94 Replacement Project Design Build
Results
Lebanon, OH

Bridge Repair - US 62-04.65
Results
OH

Fair Road Bridge Reconstruction Project
Results
Less than $2,948,005 est. value
Sidney, OH 45365

Bridge Replacement (2 Bridges) - IR 71-01.53
Results
OH

Bridge Replacement (2 Bridges) - IR 75-14.15/14.57
Results
OH

Last Updated 12/14/2018 04:09 AM
Project Title

Bridge Repair

Physical Address View project details and contacts
City, State (County) OH   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Improving a Section In Dublin Township, Mercer County, Ohio, In Accordance With Plans And Specifications By Overlaying a Bridge Deck With Superplasticized Dense Concrete Using Hydrodemolition, And Performing Various Repairs. Section 0001 Roadway Line Alt Item Code Item Description Wt Unit Quantity 0001 201e11000 Clearing And Grubbing (Wt: 01) 01 Ls 1.000 0002 202e23500 Wearing Course Removed (Asphalt), 0.75" (Wt: Nr) Nr Sy 334.000 Section 0002 Erosion Control Line Alt Item Code Item Description Wt Unit Quantity 0003 659e00300 Topsoil (Wt: 46) 46 Cy 19.000 0004 659e10000 Seeding And Mulching (Wt: 46) 46 Sy 167.000 0005 659e14000 Repair Seeding And Mulching (Wt: 46) 46 Sy 8.000 0006 659e15000 Inter-Seeding (Wt: 46) 46 Sy 8.000 0007 659e20000 Commercial Fertilizer (Wt: 46) 46 Ton 0.040 0008 659e31000 Lime (Wt: 46) 46 Acre 0.030 0009 659e35000 Water (Wt: 46) 46 Mgal 1.000 0010 832e30000 Erosion Control (Wt: 08) 08 Each 1,000.000 Section 0003 Pavement Line Alt Item Code Item Description Wt Unit Quantity 0011 407e10000 Tack Coat, 702.13 (Wt: 10) 10 Gal 50.000 0012 442e20000 Asphalt Concrete Surface Course, 12.5 Mm, Type a (448) (Wt: 10) 10 Cy 26.000 0013 617e10100 Compacted Aggregate (Wt: 06) 06 Cy 2.000 0014 617e20000 Shoulder Preparation (Wt: 06) 06 Sy 23.000 Section 0004 Traffic Control Line Alt Item Code Item Description Wt Unit Quantity 0015 621e54000 Raised Pavement Marker Removed (Wt: Nr) Nr Each 4.000 0016 646e10010 Edge Line, 6" (Wt: 45) 45 Mile 0.110 0017 646e10200 Center Line (Wt: 45) 45 Mile 0.060 Section 0005 Structure Repair (Mer-127-2289) Line Alt Item Code Item Description Wt Unit Quantity 0018 202e23500 Wearing Course Removed (Concrete), 0.75" (Wt: Nr) Nr Sy 245.000 0019 512e10100 Sealing Of Concrete Surfaces (Epoxy-Urethane) (Wt: 57) 57 Sy 65.000 0020 516e10501 Structural Expansion Joint Including Elastomeric Compression Ft 92.000 Seal, As Per Plan (Wt: 27) 27 0021 517e75600 Deep Beam Bridge Retrofit Railing (Wt: 29) 29 Ft 338.000 0022 518e22300 Special - Steel Drip Strip (Wt: 29) 29 Ft 412.000 0023 848e10201 Superplasticized Dense Concrete Overlay Using Hydrodemolition, Sy 799.000 As Per Plan, 1.75" (Wt: 29) 29 0024 848e20001 Surface Preparation Using Hydrodemolition, As Per Plan (Wt: 30) 30 Sy 799.000 0025 848e30200 Superplasticized Dense Concrete Overlay (Variable Thickness), Cy 34.000 Material Only (Wt: 29) 29 0026 848e50000 Hand Chipping (Wt: 29) 29 Sy 67.000 0027 848e50100 Test Slab (Wt: 29) 29 Ls 1.000 Section 0006 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0028 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0029 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0030 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents