Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Oak Grove Cemetery Drainage Improvement Project
Infrastructure
Bidding
Saint Marys, GA 31558

Placentia Canal Drainage Improvements-Laroche and Semken Culvert Replacement
Infrastructure
Bidding
Savannah, GA 31404

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Lake Park Road Box Culvert Repair
Infrastructure
Bidding
Valdosta, GA 31601

Street and Drainage Improvements to Oak Lane
Post-Bid
Less than $250,000 est. value
Argyle, GA 31623

Irwin County 2020 LMIG Mcneil Drive
Results
Less than $79,977 est. value
GA

Ditch Clean Out
Infrastructure
Bidding
GA

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Hammond Park Erosion and Improvement Project
Results
Sandy Springs, GA 30328

French Drain
Alteration
Bidding
Decatur, GA 30032

Last Updated 03/22/2022 09:55 AM
Project Title

Storm Water Detention Pond

Physical Address View project details and contacts
City, State (County) Bainbridge, GA 39819   (Decatur County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Perform services to clean out the existing storm water detention pond at the corner of Loop Avenue and Douglas Drive. The pond is approximately 1.2 acres in size. The removal of all trees and vegetation and undergrowth within the fenced area of the pond itself, the restoration of the pond to its original condition through the removal of excess sediment that may have accumulated, general cleanup of the pond itself and proper disposal of all materials removed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents