Similar Projects
Construct Hangar "A" - Phase 1 (Unit 2-4)
Infrastructure, Renovation
Bidding
$550,000 CJ est. value
Fort Dodge, IA 50501

Construct Hangar "A" - Phase 1 (Unit 2-4)
Infrastructure, Renovation
Bidding
$550,000 CJ est. value
Fort Dodge, IA 50501

Municipal Water Well Improvements
Infrastructure
Post-Bid
$1,131,320 CJ est. value
Dayton, IA 50530

Elanco Water Main Connection
Infrastructure
Post-Bid
$760,000 CJ est. value
Fort Dodge, IA 50501

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

Fort Dodge CSI Phase 2 - 10th Avenue North
Infrastructure
Results
$3,300,000 est. value
Fort Dodge, IA 50501

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Georgia Pacific Water Main Connection
Infrastructure
Post-Bid
$334,662 CJ est. value
Fort Dodge, IA 50501

Hma Resurfacing with Milling
Infrastructure
Results
IA

Roads - City of Fort Dodge
Infrastructure
Pending Verification
$141,450 CJ est. value
Fort Dodge, IA 50501

PCC Patching
Infrastructure
Results

Corridor Plaza - Plat 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fort Dodge, IA 50501

N. 1 St Street Reconstruction
Infrastructure
Results
$2,349,925 CJ est. value
Fort Dodge, IA 50501

AML Riverside
Addition, Demolition, Infrastructure
Pending Verification
$11,100,000 CJ est. value
Fort Dodge, IA 50501

Last Updated 04/10/2023 10:09 AM
Project Title

Bridge Deck Overlay

Physical Address View project details and contacts
City, State (County) Barnum, IA 50518   (Webster County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $644,060 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. Overlay bridge deck with a fiber reinforced high performance concrete wearing surface. B. Use a combination of micro and macro non-metallic synthetic fibers in an HPC-O concrete mix to provide crack control and improve the long-term performance of bridge deck overlays. Incorporate the fibers into the mix design in accordance with this Special Provision and the applicable requirements of Section 2413 of the Standard Specifications. Project Id : 230221 S2 County : WEBSTER Projects Included: BRF-007-5(024)--38-94 Route: IOWA 7 South Lizard Creek 0.8 mi E of W Jct Co Rd P29 Working Days : 80 Estimated Value :$500,000 - $750,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 014 - Bridge Deck Overlay *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents