Similar Projects
Daytona Campus - Parking Lots A, B and C
Post-Bid
Daytona Beach, FL 32114

Brewster Park - Parking and Overlook Improvements
Results
Less than $101,300 est. value
Deltona, FL 32738

Fort Smith/Beechdale/Blue Heron Park - Parking Improvements
Results
Less than $52,340 est. value
Deltona, FL 32725

ADA Sidewalk Extension from Mill Lake Park to Oak Avenue
Results
Less than $64,070 est. value
Orange City, FL 32725

WRF Sludge Trailer Storage Lot
Results
Less than $255,000 est. value
Port Orange, FL 32127

Deltona Lakes and Spirit Elementary Sidewalk Project
Results
Less than $711,587 est. value
Deltona, FL 32725

CDBG Riviera Park Parking Improvements
Results
Ormond Beach, FL 32173

Concrete Work
Results
Daytona Beach, FL 32117

Ponce Deleon Boulevard Multi-Use Path
Results
Less than $370,000 est. value
De Leon Springs, FL

Marine Science Center ADA Enhancements
Results
Less than $65,000 est. value
Ponce Inlet, FL 32127

New Hampshire Avenue ADA Sidewalk
Results
Less than $127,000 est. value
De Land, FL 32720

Sidewalk Repair & Reconstruction Project
Term Contract
Results
Less than $19,734 est. value
DeBary, FL 32713

Fleming Avenue ADA Sidewalk
Results
Less than $70,500 est. value
De Land, FL 32720

Orange City Votran Parking Lot
Results
Less than $715,000 est. value
Orange City, FL 32763

Spring to Spring Trail, 3B, Rob Sullivan Park to Dirksen
Results
Less than $2,575,000 est. value
DeBary, FL 32713

Last Updated 11/03/2020 03:22 PM
Project Title

Beresford Avenue Sidewalk

Physical Address View project details and contacts
City, State (County) FL   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of 0.287 miles of a 5 and 6 foot wide concrete sidewalk located on Beresford Avenue, DeLand; 615’ West of Boston Ave to Country Club Park Apartments. Construction of Roadway widening with curb and gutter. The Scope of Work includes the following; construction 0.287 miles of a 5 and 6 foot wide concrete sidewalk, clearing and grubbing, drainage structures and pipes, widening roadway, construct curb and gutter, replace any disturbed sod in-kind, remove foliage as needed, remove trees and stump grind, provide crosswalk thermoplastic striping and pedestrian warning signs, concrete driveways, fencing, option - milling and resurfacing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents