Similar Projects
High School Campus Building and Administration Building Addition
Addition
Design
Caruthersville, MO

Normandy High School Secured Connector
Addition - 25,878 SF
Bidding
Normandy, MO 63121

Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

Washington MS, Four Rivers Career Center Nurse Simulation Lab
Renovation, Addition
Post-Bid
Washington, MO 63090

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Fordland Bond Projects
Renovation, Addition
Post-Bid
Fordland, MO 65652

Senior High School 'C' Building
New Construction
Results
Sikeston, MO 63801

Elementary & High School Classrooms
Addition - 5,425 SF
Post-Bid
Silex, MO 63377

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

Congress Middle School 2021 Renovations
Renovation
Post-Bid
Kansas City, MO

Holcomb R-3 FEMA Safe Room
New Construction
Results
Holcomb, MO 63852

New Middle School, Security Upgrades and Improvements
Renovation
Post-Bid
Monett, MO 65708

Waynesville Middle School Phase III Additions and Alterations to Parker Fine Arts Building
Renovation, Addition
Post-Bid
Waynesville, MO 65583

Bernard Campbell School
Renovation, Addition
Post-Bid
Pleasant Hill, MO

Last Updated 07/19/2021 10:31 AM
Project Title

Affton High School Field

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63123   (Saint Louis County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Turnkey athletic turf field installation. Alternates include moving current scoreboard to a yet to be determined location, installing new digital scoreboard, removal of existing press box, installation of new press box located at home bleachers, installation of (250) seat visitors bleachers on the west side of field.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents