Similar Projects
Primary Wire U/G
Post-Bid
Provo, UT

Resistograph Power Pole Testing
Post-Bid
Springville, UT

Dfcm Construction-Pre Qualified Electrical-Ev Car Charging Stations Prove Area Ph. III-20351300
Results
Less than $250,000 est. value
Provo, UT

Lone Peak High Auditorium Lighting Upgrade
Results
Highland, UT 84003

138Kv Air Break Switches - Mountain Vista Substation
Post-Bid
Provo, UT

Ridgecrest Elementary School DayLighting Project
Results
American Fork, UT 84121

Covey Center Main Hall House Lighting / Control Upgrade
Post-Bid
Provo, UT

Willowcreek Middle School (Theatrical Lighting Upgrade)
Results
Lehi, UT 84043

Electric Transmission/Distribution Hardware Material
Term Contract
Post-Bid
Provo, UT 84606

DFCM Construction - Electrical Contractors - UVU Campus Lighting Upgrade
Results
$100,000 est. value
Orem, UT 84097

Distribution Transformers
Term Contract
Post-Bid
Provo, UT 84601

Provo Regional Center Transformers and Switch Gear Replacement
Results
Less than $350,000 est. value
Provo, UT

Christmas Light Installation Service
Term Contract
Post-Bid
Orem, UT

DFCM Construction Pre-Qualified Electrical Contractors-UNG Spanish Fork Armory Generator
Results
Less than $350,000 est. value
Spanish Fork, UT 84660

General Contractor and Electrical Contractor Timpanogos
Addition
Post-Bid
American Fork, UT

Reported 05/07/2021 12:00 AM
Project Title

Tanner to Mountain Vista OPGW Installation

Physical Address View project details and contacts
City, State (County) Provo, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provo City Power requests qualified Contractors submit sealed proposals to provide and install electric utility grade fiber optic ground wire and associated hardware on existing 138kV single pole structures from Tanner Substation to Mountain Vista Substation, approximately 10,000 feet. The Contractor will be responsible for the full installation, including all cable, hardware, equipment and tools necessary to complete the project

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents