Similar Projects
Landfill Gas System Support
Infrastructure
Results
Woodland, CA 95776

Landfill Disposal Site Services
Infrastructure
Post-Bid
CA

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Results
CA

Contractors Panel at the Riverside Regional Water Quality Control Plant, Citywide Sewer/Storm Drain Collection System and Tequesquite Landfill
Term Contract
Post-Bid
Riverside, CA

Construction of Waste Management Unit 6H Base Liner System
Infrastructure
Post-Bid
$6,161,416 est. value
Woodland, CA 95776

Davenport Park Landfill Gas Control System
Alteration
Results
$1,300,000 est. value
Long Beach, CA 90899

Landfill Disposal Site Services
Infrastructure
Post-Bid
CA

Landfill Gas Treatment System Upgrade
Infrastructure
Results
$350,000 est. value
Upland, CA 91786

Landfill Gas System Modifications
Infrastructure
Results
$586,000 to $645,000 est. value
Linden, Lodi, CA 95240

Landfill Disposal Site In Los Angeles County
Term Contract
Results
CA

On Call Drilling and Well Installation Services for City Landfills
Term Contract
Results
Sacramento, CA 95811

South Coast Landfill Final Closure Construction Project
Term Contract
Bidding
Gualala, CA 95445

Landfill Gas Collection and Control System Expansion
Infrastructure
Bidding
$390,000 est. value
Burbank, CA

Landfill Disposal Site Services for Toll Bridge Region
Infrastructure
Post-Bid
CA

Reported 04/08/2022 12:00 AM
Project Title

Landfill Disposal Site Services

Physical Address View project details and contacts
City, State (County) CA   (Santa Clara County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1 1,080 Ton Compacted Garbage/ Rubbish, as described in Exhibit A, Scope of Work (SOW). $ $ 2 810 Ton Loose Garbage/Rubbish, as described in Exhibit A, SOW. $ $ 3 270 Ton Wood Waste, as described in Exhibit A, SOW. $ $ 4 190 Ton Tree Trimmings, as described in Exhibit A, SOW. $ $ 5 1,080 Ton Clean Fill, as described in Exhibit A, SOW. $ $ 6 135 Ton Mud, as described in Exhibit A, SOW. $ $ 7 270 Ton Mixed Aggregate, as described in Exhibit A, SOW. $ $ 8 270 Ton Mixed Aggregate eighteen inches (18”) and up, as described in Exhibit A, SOW. $ $ 9 270 Ton Concrete, as described in Exhibit A, SOW. $ $ 10 2,000 Ton Roadway Sweepings, as described in Exhibit A, SOW

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents