Similar Projects
Brookfield Square Mall
New Construction, Demolition, Infrastructure - 600,000 SF
Design
$81,000,000 est. value
Elm Grove, WI 53122

CTH B, Intersection with Morgan Road
Infrastructure
Bidding
$250,000 to $499,999 est. value
Oconomowoc, WI 53066

2022 Crack Fill and Striping Projects
Infrastructure
Bidding
$400,000 est. value
Waukesha, WI

2021 Street Maintenance
Post-Bid
Oconomowoc, WI

2021 Road Program
Post-Bid
Brookfield, WI 53045

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Perkins Avenue Utility and Street Improvements
Results
Waukesha, WI 53186

Road X Pavement Overlay
Infrastructure
Bidding
$280,000 est. value
Eagle, WI 53119

2021 Road Improvement Program
Post-Bid
Delafield, WI

N & S Prairie Avenue, Sentry Drive and West Sunset Drive Utility and Street Improvements
Results
Waukesha, WI 53146

STH 16, 5,800' West of STH 83 - STH 190
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
Nashotah, WI 53058

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Blackfoot Drive Water Main Relay, Storm Sewer and Street Reconstruction
Results
Less than $575,000 est. value
Menomonee Falls, WI 53051

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Oxford Road, Downing Drive, Algoma Terrace, Rawlins Drive and Badger Drive Utility and Street Improvements
Results
Waukesha, WI 53186

Last Updated 07/14/2022 08:44 AM
Project Title

2022 Pavement Rehabilitation - Rolling Hills Elementary

Physical Address View project details and contacts
City, State (County) Mukwonago, WI 53149   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The base bid consists of three sections and total approximately 8,500 square yards of pavement. The two add alternates total approximately 6,100 square yards of pavement. Two schedules of prices, one is designated for rehabilitation using hot mix asphalt and the other is rehabilitation using portland cement concrete.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents