Similar Projects
Local Road Maintenance
Bidding
La Valle, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Asphaltic Paving
Results
Baraboo, WI

2021 Seal Coating
Bidding
WI

2021 Sycamore Street Reconstruction
Post-Bid
Sauk City, WI 53583

Reedsburg - Wisconsin Dells, N. Jct. STH 33 Intersection, Reedsburg -Wisconsin Dells, Copper Springs Road to N. Jct. STH 33, Reedsburg - Baraboo,N. Jct. STH 23 to USH 12
Results
Baraboo, Reedsburg, Wisconsin Dells, WI

CTHW - Local Road Improvement
Bidding
Baraboo, WI

2021 Asphaltic Concrete Pavement
Post-Bid
Reedsburg, WI 53959

2021 8th Street and North Dewey Reconstruction
Results
Less than $410,000 est. value
Reedsburg, WI 53959

2021 Road Improvements
Bidding
WI

21st Street Extension
Results
Prairie du Sac, WI

2021 Street Improvements
Results
Baraboo, WI

Last Updated 11/16/2020 01:40 PM
Project Title

Sauk City - IH 39, Eagle View Court to Weynand Road

Physical Address View project details and contacts
City, State (County) Sauk City, WI 53583   (Sauk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 78; 8.542 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Signs, Beam Guard, and Pavement Marking. Consist of HMA pavement, excavation common, base aggregate dense, select crushed material, concrete curb and gutter replacement, beamguard replacement, rumble strips, signing, pavement marking. Excavation Common, 163,806 CY; Base Aggregate Dense, 118,367 Ton; Select Crushed Material, 122,215 Ton; Marking Epoxy, 73,089 LF; Construction Staking, 244,879 LF; Construction Staking, 1 LS; Concrete Curb and Gutter, 7,561 LF; Concrete Sidewalk, 51 SF; Beam Guard, 2,950 LF; Beam Guard Energy Absorbing Terminals, 10 Each; HMA Pavement, 48,383 Ton; Tack Coat, 21,923 Gals; Signs, 834 SF; Marking Line Grooved Wet Ref Epoxy 4-Inch, 86,833 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents