Similar Projects
C Rice Lake, Hammond Avenue Const / Misc / Culvert Replacement
Renovation, Infrastructure
Conception
$750,000 to $1,000,000 est. value
Cumberland, WI 54829

Mondovi - Osseo - Construction / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Osseo, WI 54758

Arlington - Columbus, STH 22 to Commerce Drive
Infrastructure
Design
$10,000,000 CJ est. value
Arlington, WI 53911

Arlington - Columbus, STH 22 to Commerce Drive
Infrastructure
Design
$10,000,000 CJ est. value
Arlington, WI 53911

West Badger Road Salt Barn
New Construction, Infrastructure
Bidding
$2,399,455 CJ est. value
Madison, WI 53713

2022 South Shore Road Reconstruction
Infrastructure
Bidding
$3,000,000 CJ est. value
Baraboo, WI 53913

O.b. Sherry Park – 3457/3461/3465 Milwaukee St. Demolition
Demolition, Infrastructure
Sub-Bidding
$90,000 CJ est. value
Madison, WI 53714

Spring Harbor Dredging 2022
Infrastructure
Sub-Bidding
$742,800 CJ est. value
Madison, WI 53715

Machickanee Boat Landing - Site Redevelopment
Post-Bid
Stiles, WI

Stump Grinding, Removal and Site Restoration
Infrastructure, Alteration
Post-Bid
Milwaukee, WI

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Village of Dane Southeast Public Works Loop
Results
Dane, WI

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

RFP Design - Modernization - WASF facility
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Milwaukee, WI 53204

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

Last Updated 08/16/2022 08:06 AM
Project Title

Ho-Chunk Wazee Community Water and Sanitary Sewer Extensions

Physical Address View project details and contacts
City, State (County) Black River Falls, WI 54615   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Environmental Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 1340 feet of 8-inch PVC C900 water main; installation of approximately (8) gate valves with boxes; installation of approximately (4) fire hydrants with gate valves; installation of approximately (1) 2-inch water service line; installation of approximately 635 feet of 8-inch SDR 26 sewer main; installation of approximately 800 feet of 8-inch SDR 35 sewer main; installation of approximately (5) concrete manholes; installation of approximately (1) 4-inch sewer service including wye Davis Bacon wage rates apply to this project. Site Directions: Ho-Chunk Wazee is located approximately 3.5 miles northeast of the STH 54/Interstate 94 interchange in Black River Falls. The development is located off of Mission Road. Refer to the plan set for the exact location of the extensions within the Ho-Chunk Wazee development.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents