Similar Projects
Mulberry Street Improvements
Infrastructure
Bidding
Valley Falls, KS

Bridge on Ridge Road between 39th South and 47th South (B497)
New Construction, Infrastructure
Bidding
Wichita, KS

2021 Street Resurfacing
Post-Bid
$3,500,000 to $4,200,000 est. value
Kansas City, KS

9th Street and UBAS Program
Infrastructure
Post-Bid
Prairie Village, KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

K-14 Mill and Overlay
Infrastructure
Bidding
$310,000 est. value
Beloit, KS

2021 Cars Webster Street
Alteration
Post-Bid
Spring Hill, KS

2021 Asphalt Overlay Program
Results
KS

Street Improvement Project
Infrastructure
Bidding
Topeka, KS 66630

2021 Pavement Management Program
Infrastructure
Post-Bid
Leavenworth, KS

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Pavement to Serve the Entrance of Schulte-Johnson 2nd Addition tied with Pavement to Serve Phase 1A of Schulte-Johnson 2nd Addition
Infrastructure
Bidding
Wichita, KS

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

Mill and Overlay
Results
$831,421 est. value
KS

Last Updated 08/02/2021 11:48 AM
Project Title

TAPR - Bottomland Trail Improvements

Physical Address View project details and contacts
City, State (County) Strong City, KS 66869   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will pave the surface of Bottomland Trail in concrete and will pave a portion of the Trailhead Parking Lot. The Bottomland Trail currently is a gravel trail without a firm, stable (paved) surface and the trail is often prone to wash outs and rutting creating a walking surface that frequently does not meet the Architectural Barriers Act Accessibility Standards (ABAAS). ABAAS improvements consist primarily of hardening the Bottomland Trail, to become the preserve’s first and only fully accessible trail, including paving several Accessible Parking Spaces at the Trailhead and resetting 5 Wayside Exhibit panels

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents