Similar Projects
Last Updated | 04/26/2022 02:42 AM |
Project Title | Excess Flow Basin Backwater Gates |
Physical Address | View project details and contacts |
City, State (County) | Gurnee, IL (Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work on this Contract consists of removing the twelve existing backwater gates in drainage structures 1-6 west of the excess flow basins. They shall be replaced with twelve 24" diameter Rodney Hunt gates. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |