Similar Projects
Addition of Variable Freqeuncy Drives for Water Supply Facilities-Oak Meadows and Hidden Springs
Alteration
Bidding
$5,511,000 est. value
Orlando, FL 32835

Construction Management at Risk - Andover Elementary School HVAC Capital Renewal Project
Alteration
Bidding
$4,400,000 est. value
Orlando, FL 32825

HVAC and Mechanical Products
Term Contract
Post-Bid

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Orange County Corrections Phoenix Chiller Replacement
Results
Less than $645,000 est. value
Orlando, FL 32839

City-Wide Air Conditioning and Heating Maintenance
Term Contract
Results
Ocoee, FL 34761

Data Center HVAC Services South Terminal Complex (STC) Local Developing Business (LDB)
Alteration
Bidding
$50,000 est. value
Orlando, FL 32827

York Chiller Maintenance Services
Post-Bid
Orlando, FL

Construction Management at Risk for Piedmont Lakes Middle School HVAC System Replacement Project
Results
Less than $5,200,000 est. value
Apopka, FL 32703

Daikin/Mcquay Chillers Maintenance
Post-Bid
Orlando, FL 32827

HVAC Maintenance and Repair for Utilities Facilities
Term Contract
Results
FL

Corrections Booking and Release Center Air Handling Unit (AHU) Replacement
Post-Bid
$1,350,000 est. value
Orlando, FL 32839

HVAC Filter and Installation Services
Term Contract
Results
Orlando, FL

HVAC Services at The Catholic Charities of Central Florida
Term Contract
Post-Bid
Orlando, FL 32813

Rooftop Unit (RTU) Replacement
Results

Last Updated 05/16/2022 09:25 AM
Project Title

Administration Center Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not necessarily limited to the following: Setting up a temporary air-cooled chiller to support the needs of the facility while the cooling towers are inoperative; demolition of the existing 2-cell cooling tower and its associated outdoor condenser water piping and accessories; and providing a new stainless steel 2-cell cooling tower and associated outdoor condenser water piping and accessories.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents